首页
登录
职称英语
If the Dakota Access Pipeline(输油管道) is completed, it will carry nearly half
If the Dakota Access Pipeline(输油管道) is completed, it will carry nearly half
游客
2024-01-15
23
管理
问题
If the Dakota Access Pipeline(输油管道) is completed, it will carry nearly half a million barrels of oil across four states every day. Energy Transfer Partners (ETP) , a Texas-based company behind the $3. 8 billion project, hopes to finish construction this year. But the Standing Rock Sioux, an American Indian tribe(部落), is determined to stop the 1,172-mile pipeline from being built. (76)
Both sides show no signs of backing down.
The Dakota Access Pipeline was announced in 2014. A section of it will run near the Standing Rock Sioux reservation. A reservation is an area of land set aside for American Indians. The tribe says the construction threatens to destroy historical areas and ancient burial sites. They also say the pipeline could pollute their main water source, the Missouri River. In April, the Standing Rock Sioux began a protest against the project. They camped at the construction site. Since then, thousands of people, including people from American Indian tribes, have traveled to the site to join the protest.
ETP says that the pipeline will have built-in safety measures to protect against oil leaks. Workers will also monitor it remotely, and will be able to close valves (阀) within three minutes if leaks are detected.
American Indians have been staging a nonviolent protest for months. The protest took a turn last week when police were called to keep the peace between protesters and armed security guards hired by the company.
(77)
Twenty-eight people have been arrested since then and charged with interfering with the pipeline construction.
[br] Why do American Indians protest against the construction of this pipeline?
选项
A、Because it will cost up to $3.8 billion.
B、Because it threatens the region’s water supply.
C、Because it will make many people lose their jobs.
D、Because it will force many people to leave their homes.
答案
B
解析
细节题。题干问的是“为什么美国印第安人抗议反对输油管道的建设?”根据定位句“他们同时认为管道可能会污染当地的主要水源——密苏里河”可知,印第安人反对管道建设的一个原因是担心管道会污染水源。A项“因为工程耗资达38亿”,不是印第安人抗议的原因;C项“因为很多人会因此失业”和D项“这将迫使很多人离开家园”均未在文中提及,故选B。
转载请注明原文地址:https://tihaiku.com/zcyy/3366065.html
相关试题推荐
He______havecompletedhiswork;otherwise,howwouldn’tbeenjoyinghimselfby
______nearlyallbehaviorislearnedbehaviorisabasicassumption(假设)ofsocia
Newspapersarenotnearlyaspopulartodayastheywereinthepast.Therea
Newspapersarenotnearlyaspopulartodayastheywereinthepast.Therea
Thecloudshadspreadandnearly______theentiresky.A、separatedB、hiddenC、bloc
Thereisno______tothehousefromthemainroad.A、accessB、avenueC、exposureD、
Regretisascommonanemotionasloveorfear,anditcanbenearlyaspowe
Regretisascommonanemotionasloveorfear,anditcanbenearlyaspowe
Regretisascommonanemotionasloveorfear,anditcanbenearlyaspowe
Thereisno______tothehousefromthemainroad.A、accessB、avenueC、exposureD、
随机试题
Interruption,moresurelythananythingelse,killsconversation.Thebesto
心电图诊断二度Ⅰ型房室传导阻滞的主要依据是()A.P波与QRS波群无关 B
分批零件法要分别计算零件、部件的成本和产品的成本,而分批法只计算产品的成本不单独
高层建筑中电缆竖井的门应为( )。A.普通门 B.甲级防火门 C.乙级防火
张女士,42岁,近日感到双腿关节疼痛,行走、提重物和在上楼时疼痛加剧。因多日未愈
当了几年老师后,闻老师越发感到工作缺乏新鲜感,觉得就自己的能力而言.当老师简直就
B
根据下列材料设计教学片段。 (1)《义务教育历史课程标准(2011年版)》规定
试验性将猪心移植给猴,属A.自体移植B.同种移植C.异种移植D.同系移植E.胚胎
甲公司准备建造一座大型厂房,总投资额2000万元。因为想要缩短建设周期,尽快投产
最新回复
(
0
)