首页
登录
职称英语
If the Dakota Access Pipeline(输油管道) is completed, it will carry nearly half
If the Dakota Access Pipeline(输油管道) is completed, it will carry nearly half
游客
2024-01-15
22
管理
问题
If the Dakota Access Pipeline(输油管道) is completed, it will carry nearly half a million barrels of oil across four states every day. Energy Transfer Partners (ETP) , a Texas-based company behind the $3. 8 billion project, hopes to finish construction this year. But the Standing Rock Sioux, an American Indian tribe(部落), is determined to stop the 1,172-mile pipeline from being built. (76)
Both sides show no signs of backing down.
The Dakota Access Pipeline was announced in 2014. A section of it will run near the Standing Rock Sioux reservation. A reservation is an area of land set aside for American Indians. The tribe says the construction threatens to destroy historical areas and ancient burial sites. They also say the pipeline could pollute their main water source, the Missouri River. In April, the Standing Rock Sioux began a protest against the project. They camped at the construction site. Since then, thousands of people, including people from American Indian tribes, have traveled to the site to join the protest.
ETP says that the pipeline will have built-in safety measures to protect against oil leaks. Workers will also monitor it remotely, and will be able to close valves (阀) within three minutes if leaks are detected.
American Indians have been staging a nonviolent protest for months. The protest took a turn last week when police were called to keep the peace between protesters and armed security guards hired by the company.
(77)
Twenty-eight people have been arrested since then and charged with interfering with the pipeline construction.
[br] Why do American Indians protest against the construction of this pipeline?
选项
A、Because it will cost up to $3.8 billion.
B、Because it threatens the region’s water supply.
C、Because it will make many people lose their jobs.
D、Because it will force many people to leave their homes.
答案
B
解析
细节题。题干问的是“为什么美国印第安人抗议反对输油管道的建设?”根据定位句“他们同时认为管道可能会污染当地的主要水源——密苏里河”可知,印第安人反对管道建设的一个原因是担心管道会污染水源。A项“因为工程耗资达38亿”,不是印第安人抗议的原因;C项“因为很多人会因此失业”和D项“这将迫使很多人离开家园”均未在文中提及,故选B。
转载请注明原文地址:https://tihaiku.com/zcyy/3366065.html
相关试题推荐
He______havecompletedhiswork;otherwise,howwouldn’tbeenjoyinghimselfby
______nearlyallbehaviorislearnedbehaviorisabasicassumption(假设)ofsocia
Newspapersarenotnearlyaspopulartodayastheywereinthepast.Therea
Newspapersarenotnearlyaspopulartodayastheywereinthepast.Therea
Thecloudshadspreadandnearly______theentiresky.A、separatedB、hiddenC、bloc
Thereisno______tothehousefromthemainroad.A、accessB、avenueC、exposureD、
Regretisascommonanemotionasloveorfear,anditcanbenearlyaspowe
Regretisascommonanemotionasloveorfear,anditcanbenearlyaspowe
Regretisascommonanemotionasloveorfear,anditcanbenearlyaspowe
Thereisno______tothehousefromthemainroad.A、accessB、avenueC、exposureD、
随机试题
[originaltext]W:Hello!M:Goodevening.IsthatMrs.Philips?W:Yes,itis.M
Ofthemillionsofinventions,whataretheeightgreatest?A)I’vedraw
远程教育机构为服务九年制义务教育,使用已经发表的音乐作品制作课件,并向注册学生提
在一幅地图上,等高线间距大,则表示地面坡度较( )。A.深 B.高
在不考虑噪声的条件下,光纤能达到的极限数据率是()Tbps;光纤上信号在传输
A.代谢性酸中毒 B.呼吸性碱中毒 C.代谢性碱中毒 D.呼吸性酸中毒
橄榄-脑桥-小脑变性常见的首发症状A.双下肢共济失调 B.核上性眼肌麻痹 C
在确定进一步审计程序的范围时,注册会计师应当考虑的主要因素有( )。 A.
水样硫化物测定时,不受水样色度、浊度的影响,不必预处理样品的方法为()。A、比
消费税应税消费品生产企业收取的下列款项,应计入消费税计税依据的有()。A
最新回复
(
0
)