Tacoma Narrows Bridge Disaster Strikes
When the Tacoma Narrows Bridge opened for traffic on 1 July 1940, it was celebrated as a major engineering achievement. Even before construction was completed, however, flaws in the design were apparent; workers sucked on lemon slices to avoid motion sickness as the structure swayed in the relatively mild winds. Engineers tried three different revisions during construction to address the vibration problem. Initially, fie-down cables were anchored to fifty-tone bulkheads on the river banks. These were ineffective, as the cables soon detached. Then a pair of inclined cable locks was introduced to connect the main cables to the bridge deck at mid-span. These stayed throughout the bridge’s lifespan, but did nothing to reduce vibration. A further measure—the installation of hydraulic dampers between the towers and the floor system—was nullified because the dampers were compromised when the bridge was sand-blasted before painting.
Shortly after opening, the bridge quickly acquired the fond nickname of "Galloping Gertie" because of the way it would roll in either side-to-side or length-ways movements—known in physics terms as the longitudinal and transverse modes of vibration respectively. These movements did not compromise the core integrity of the structure, but did make the crossing a somewhat white-knuckle affair. Many drivers reported seeing cars ahead disappear from sight several times as they sank into troughs from transverse vibrations (imagine the ripple across a packed stadium during a Mexican wave ). The experience of a longitudinal wave is closely analogous, but more accurately associated with the waves one would encounter in the ocean. On a suspension bridge though, these waves are a unique experience—some dare-devils were happy to pay the 75c toll just for the thrill!
Four months later, however, a never-before-seen type of vibration began afflicting the bridge in what were still fairly gentle winds (about 40 kemp). Rather than the simple "wave" motion that characterizes longitudinal and transverse vibration, the left side of the bridge would rise while the right side fell, but the centre line of the road would remain completely level. This was proved when two men walked along the centre of the bridge completely unaffected by the rocking motions around them. Visually the bridge’s movements seemed to be more like a butterfly flapping its wings than a simple rolling motion. Engineers now understand this to be the tensional mode of vibration, and it is extremely hard to detect. In aero plane design, for example, even minute shifts of the aircraft’s mass distribution and an alteration in one component can affect a component with which it has no logical connection. In its milder forms this can cause a light buzzing noise, similar to that which a wasp or a bumble bee makes, but when allowed to develop unchecked it can eventually cause the total destruction of an aero plane.
The tensional mode of vibration is the consequence of a set of actions known as aerostatic flutter. This involves several different elements of a structure oscillating from the effect of wind, with each cycle of fluttering building more energy into the bridge’s movements and neutralizing any structural damping effects. Because the wind pumps in more energy than the structure can dissipate, and the oscillations feed off each other to become progressively stronger, the aerostatic fluttering and tensional vibrations were all but assured to destroy the Tacoma Bridge on the morning of 7 November. At 11.00 a.m. the fluttering had increased to such amplitude that the suspender cables were placed under excessive strain. When these buckled, the weight of the deck transferred to the adjacent cables which in turn were unable to support the weight. These cables buckled, leaving nothing to stop the central deck breaking off into the Tacoma River.
It was at around 10.15 a.m. on 7 November that tensional vibration began afflicting the bridge. This made driving treacherous, and newspaper editor Leonard Coats worth’s car was jammed against the curb in the centre of the bridge as he attempted to cross. Coats worth tried to rescue his daughter’s cocker spaniel from the back seat but was unsuccessful, and fearing for his life, crawled and staggered to safety on his own. At this point, an engineering professor named Bert Farquharson proceeded onto the bridge in an attempt to save the frightened animal. Farquharson had been video-recording from the banks of the fiver and had just returned from purchasing more rolls of film. As an avowed dog lover he felt obliged to attempt a rescue. Unfortunately, the professor too was bitten and retreated empty handed, walking off just moments before the cables snapped and the giant concrete mass of the central deck caved inwards and disappeared into the fiver.
Questions 14-16
Complete the notes below.
Choose NO MORE THAN TWO WORDS from the passage for each answer.
Write your answers in boxes ]4-16 on your answer sheet.
Engineers used various techniques while building the bridge to reduce wobble:
they attached (14) to heavy blocks on the shoreline
they fastened main cables to the middle of the (15)
(16) were placed between the tallest parts of the structure and the deck. [br]
选项
答案
hydraulic dampers
解析
转载请注明原文地址:https://tihaiku.com/zcyy/3346411.html
相关试题推荐
Ifbigsumsaretobespentoncleaningupenvironmentaldisasters,itisbetter
LanCaodescribeshernovelMonkeyBridgeasautobiographical"inmoodratherth
AdisasterofTitanicproportionsAt11.39p.m.onthee
AdisasterofTitanicproportionsAt11.39p.m.onthee
AdisasterofTitanicproportionsAt11.39p.m.onthee
AdisasterofTitanicproportionsAt11.39p.m.onthee
AdisasterofTitanicproportionsAt11.39p.m.onthee
AdisasterofTitanicproportionsAt11.39p.m.onthee
AdisasterofTitanicproportionsAt11.39p.m.onthee
AdisasterofTitanicproportionsAt11.39p.m.onthee
随机试题
AnOhioStateUniversitystudyhaslinkedbehaviorinyoungchildren【1】thet
Areyouthinkingabouttryingoutapoliticalcareerbutyour【C1】______are
TheVictorianshadbecomeaddictedtospeedandtheywantedtogoeverfaste
Thefollowingisanadvertisement.Afterreadingit,youshouldcompletetheinf
预先给予酚妥拉明,再给予肾上腺素,血压表现为A.先升高后下降 B.下降 C.
在商业银行贷前调查中,贷款合规性调查主要包括()。A.认定借款人、担保人合法主
某孕妇,30岁,在孕20周的时候,由于受凉后出现发热症状,前来医院就诊,为缓解患
A.00 B.01 C.10 D.11
关于货币供应量,说法正确的是()。A.存款是商业银行的资产 B.货币供应
关于工程项目管理模式说法,正确的有()。A.管理模式的选择是项目准备阶段的重要
最新回复
(
0
)