首页
登录
职称英语
You should spend about 20 minutes on Questions 14-26, which are based on Reading
You should spend about 20 minutes on Questions 14-26, which are based on Reading
游客
2024-01-08
1
管理
问题
You should spend about 20 minutes on Questions 14-26, which are based on Reading Passage 2 below.
Keep the Water Away
A Last winter’s floods on the rivers of central Europe were among the worst since the Middle Ages, and as winter storms return, the spectre of floods is returning too. Just weeks ago, the river Rhone in south-east France burst its banks, driving 15,000 people from their homes, and worse could be on the way. Traditionally, river engineers have gone for Plan A: get rid of the water fast, draining it off the land and down to the sea in tall-sided rivers re-engineered as high-performance drains. But however big they dug city drains, however wide and straight they made the rivers, and however high they built the banks, the floods kept coming back to taunt them, from the Mississippi to the Danube. And when the floods came, they seemed to be worse than ever. No wonder engineers are turning to Plan B: sap the water’s destructive strength by dispersing it into fields, forgotten lakes, flood plains and aquifers.
B Back in the days when rivers took a more tortuous path to the sea, flood waters lost impetus and volume while meandering across flood plains and idling through wetlands and inland deltas. But today the water tends to have an unimpeded journey to the sea. And this means that when it rains in the uplands, the water comes down all at once. Worse, whenever we close off more flood plains, the river’s flow farther downstream becomes more violent and uncontrollable. Dykes are only as good as their weakest link—and the water will unerringly find it. By trying to turn the complex hydrology of rivers into the simple mechanics of a water pipe, engineers have often created danger where they promised safety, and intensified the floods they meant to end. Take the Rhine, Europe’s most engineered river. For two centuries, German engineers have erased its backwaters and cut it off from its flood plain.
C Today, the river has lost 7 percent of its original length and runs up to a third faster. When it rains hard in the Alps, the peak flows from several tributaries coincide in the main river, where once they arrived separately. And with four-fifths of the lower Rhine’s flood plain barricaded off, the waters rise ever higher. The result is more frequent flooding that does ever-greater damage to the homes, offices and roads that sit on the flood plain. Much the same has happened in the US on the mighty Mississippi, which drains the world’s second largest river catchment into the Gulf of Mexico.
D The European Union is trying to improve rain forecasts and more accurately model how intense rains swell rivers. That may help cities prepare, but it won’t stop the floods. To do that, say hydrologists, you need a new approach to engineering not just rivers, but the whole landscape. The UK’s Environment Agency—which has been granted an extra £150 million a year to spend in the wake of floods in 2000 that cost the country £1 billion—puts it like this: "The focus is now on working with the forces of nature. Towering concrete walls are out, and new wetlands are in." To help keep London’s feet dry, the agency is breaking the Thames’s banks upstream and reflooding 10 square kilometres of ancient flood plain at Otmoor outside Oxford. Nearer to London it has spent £100 million creating new wetlands and a relief channel across 16 kilometres of flood plain to protect the town of Maidenhead, as well as the ancient playing fields of Eton College. And near the south coast, the agency is digging out channels to reconnect old meanders on the river Cuckmere in East Sussex that were cut off by flood banks 150 years ago.
E The same is taking place on a much grander scale in Austria, in one of Europe’s largest river restorations to date. Engineers are regenerating flood plains along 60 kilometres of the river Drava as it exits the Alps. They are also widening the river bed and channelling it back into abandoned meanders, oxbow lakes and backwaters overhung with willows. The engineers calculate that the restored flood plain can now store up to 10 million cubic metres of flood waters and slow storm surges coming out of the Alps by more than an hour, protecting towns as far downstream as Slovenia and Croatia.
F "Rivers have to be allowed to take more space. They have to be turned from flood-chutes into flood-foilers," says Nienhuis. And the Dutch, for whom preventing floods is a matter of survival, have gone furthest. A nation built largely on drained marshes and seabed had the fright of its life in 1993 when the Rhine almost overwhelmed it. The same happened again in 1995, when a quarter of a million people were evacuated from the Netherlands. But a new breed of "soft engineers" wants our cities to become porous, and Berlin is their shining example. Since reunification, the city’s massive redevelopment has been governed by tough new rules to prevent its drains becoming overloaded after heavy rains. Harald Kraft, an architect working in the city, says: "We now see rainwater as a resource to be kept rather than got rid of at great cost." A good illustration is the giant Potsdamer Platz, a huge new commercial redevelopment by Daimler Chrysler in the heart of the city.
G Los Angeles has spent billions of dollars digging huge drains and concreting river beds to carry away the water from occasional intense storms. The latest plan is to spend a cool $280 million raising the concrete walls on the Los Angeles river by another 2 metres. Yet many communities still flood regularly. Meanwhile this desert city is shipping in water from hundreds of kilometres away in northern California and from the Colorado river in Arizona to fill its taps and swimming pools, and irrigate its green spaces. It all sounds like bad planning. "In LA we receive half the water we need in rainfall, and we throw it away. Then we spend hundreds of millions to import water," says Andy Lipkis, an LA environmentalist, along with citizen groups like Friends of the Los Angeles River and Unpaved LA, want to beat the urban flood hazard and fill the taps by holding onto the city’s flood water. And it’s not just a pipe dream. The authorities this year launched a $100 million scheme to road-test the porous city in one flood-hit community in Sun Valley. The plan is to catch the rain that falls on thousands of driveways, parking lots and rooftops in the valley. Trees will soak up water from parking lots. Homes and public buildings will capture roof water to irrigate gardens and parks. And road drains will empty into old gravel pits and other leaky places that should recharge the city’s underground water reserves. Result: less flooding and more water for the city. Plan B says every city should be porous, every river should have room to flood naturally and every coastline should be left to build its own defences. It sounds expensive and Utopian, until you realise how much we spend trying to drain cities and protect our watery margins—and how bad we are at it.
Questions 14-19
Reading Passage 2 has seven paragraphs, A-G.
Which paragraph contains the following information?
Write the correct letter, A-G, in boxes 14-19 on your answer sheet. [br] one project on a river that benefits three nations
选项
答案
E
解析
题干说:一个利于三个国家的项目。根据题干关键词“benefits”和“three nations”可定位到原文E段提到了一个项目,这个项目的三个受益的国家分别是Austria,Slovenia,Croatia。因此,本题的答案为E。
转载请注明原文地址:https://tihaiku.com/zcyy/3343343.html
相关试题推荐
QUIBBLES:OBJECTIONS::A、questions:repliesB、foibles:flawsC、estimations:
MEETING:MINUTES::A、video:imageB、report:synopsisC、seism:quiverD、perfo
Directions:Eachofthefollowingreadingcomprehensionquestionsisbasedonth
Sendingarobotintospacetogatherinformationisaviableoption,butshould
Sendingarobotintospacetogatherinformationisaviableoption,butshould
Inarecentstudy,DavidCressyexaminestwocentralquestionsconcerningEnglis
Intheearlytwentiethcentury,theideathatpianistsshouldbemusician-schola
Intheearlytwentiethcentury,theideathatpianistsshouldbemusician-schola
Intheearlytwentiethcentury,theideathatpianistsshouldbemusician-schola
WriterJohnWorthensuggestedthat,insomecases,biographersshouldbe(i)____
随机试题
本美术馆是以收藏、研究、展示中国近现代至当代艺术家作品为重点的国家艺术博物馆。TheNationalArtMuseumofChina(NAMOC)
PASSAGETHREE[br]Whatdoes"counting"meaninthecontext?Continuing.抵制香烟的运动已经
HowYourLanguageAffectsYourWealthandHealth[A]Doesthelanguag
当土工合成材料单纯用于加筋目的时,宜选择强度高、变形小、糙度小的土工格栅。()
关于行政法规和行政许可,下列说法正确的是( )。A.行政法规可以在法律设定的行
关于尿道结石的描述,错误的是A:排尿困难,点滴状排尿 B:尿痛 C:急性尿失
下列有关企业物流的说法中错误的是()。A:生产企业物流是以购进生产所需的原材料、
某商品住宅项目的土地成本、建设成本、管理费用、销售费用、投资利息、销售税金分别为
客户申请开展融资融券业务要在证券公司开立客户信用交易担保证券账户和客户信用交易担
某施工单位邀请招标,施工总承包了一-家国有企业投资的某高层工程项目,因高层施进行
最新回复
(
0
)