首页
登录
职称英语
Between what times is the road traffic lightest? [br] The noise levels at the si
Between what times is the road traffic lightest? [br] The noise levels at the si
游客
2024-01-07
31
管理
问题
Between what times is the road traffic lightest? [br] The noise levels at the site can reach
Good afternoon. I’m Paula Bundell and I am giving you the lectures on Environmental
Noise this term. Today we are going to look into the effects of noise on a planned housing
estate in a particularly difficult part of the new Manchester Park area.
This site is not as bad as some I have researched in the past. The Blacktown airport is
closed from 6pm to 7am and this is a great advantage to the site. The only noise after dark
is from the highway and the traffic is somewhat reduced between 7.30pm and 5.30am. 【Q31】
So, the people most affected by the noise will be, I expect, housewives. By the time most of 【Q32】
the students and workers have arrived back home in the evening during the week the noise
will have abated to a fairly large extent. The weekends are still a problem of course, but the
traffic is certainly reduced on Saturdays to a large extent and even more so on Sundays. 【Q33】
Of course modifications to houses will be necessary at a site like this and they come at a
significant cost to the developer and home buyer. The modifications I am about to outline
will add about $25,000 to the price of a newly-built house. That will still mean a cheaper 【Q34】
house than in a less noisy and more desirable area.
A bit of background would not go astray. I understand that you are all familiar with the
proposed development site at Manchester Park.
It’s a particularly difficult one in terms of noise with the highway along the eastern
perimeter and the Blacktown airport not 3 kilometres away to the north.
Of course, those nearest the highway will be the worst hit, with heavy traffic noise as
well as the noise from the light planes overhead. As you all know, the normal noise
threshold for private housing is 55 decibels. At this site the levels have been recorded as 【Q35】
high as 67 decibels.
The construction of the houses has to be somewhat modified from houses in most areas. In
the houses on the highway and in the noisiest areas of this site there will be a need for
specialised double glazing and special acoustic seals will have to be fitted to the doors. 【Example】
All exterior doors in this especially noisy pocket will have to be solid core wood doors with
hinges. Every house built on this site, not just those adjacent to the highway or nearest to
the airport, will require high density insulation materials in the roof. Not only will all the
roofs need insulating, the exterior walls will be required to be double brick. All ceilings will 【Q36】
require double thickness plaster board to be used in the construction. In the noisiest areas
mechanical ventilation will have to be installed in the exterior walls. In those areas with 【Q37】
sealed windows it will be necessary to fit fans with absorbers to cut out the noise in those
particular houses. Air conditioning units could also be fitted in the ceilings of such houses 【Q38】
but this is substantially more expensive than fans, and may not be needed on this site.
Coming back now to the double glazing I mentioned before. Specialised double glazing
requires a larger air gap between the inner and outer glass than normal double glazing.
The gap must be at least 7 centimetres. The thickness of the glass is also a factor, 8 【Q39】
millimetres on the outside and 6 on the inside pane. It is essential that the glass be thicker
on the outside than on the inside and that the gap between the panes of glass be a
minimum of 7 centimetres.
Obviously, the noise factor will have to be taken into consideration with the layout of
the houses. Living areas will have to be designed at the back of the houses away from the
highway. Bedrooms and living rooms will have to be built towards the back, and for those 【Q40】
houses closest to the highway two layers of plasterboard will be needed for the interior
bedroom walls. Those rooms constructed at the front of the houses should be garages,
laundries, kitchens, bathrooms and dining rooms.
I have come to the conclusion that this development should go ahead, but with various
acoustic modifications according to the position of the block in relation to the highway
and intersection.
选项
A、45 decibels.
B、55 decibels.
C、67 decibels.
D、70 decibels.
答案
C
解析
转载请注明原文地址:https://tihaiku.com/zcyy/3341925.html
相关试题推荐
PovertyandHealthThelinkbetweenhealthandeconomic
PovertyandHealthThelinkbetweenhealthandeconomic
PovertyandHealthThelinkbetweenhealthandeconomic
PovertyandHealthThelinkbetweenhealthandeconomic
PovertyandHealthThelinkbetweenhealthandeconomic
PovertyandHealthThelinkbetweenhealthandeconomic
PovertyandHealthThelinkbetweenhealthandeconomic
PovertyandHealthThelinkbetweenhealthandeconomic
ClassifythefollowingasfirstoccurringAbetween1945and1950Bbetween1950
ClassifythefollowingasfirstoccurringAbetween1945and1950Bbetween1950
随机试题
Thestartofhighschooldoesn’thavet
Itseemsyoualwaysforget—yourreadingglasseswhenyouarerushingtowork
成年男性患者,热烧伤80%,合并中度吸入性损伤,伤后4小时来院就诊。体检及化验发
患者女,27岁。剖宫产术后4天。左下肢胀痛1天,查体可见左下肢肿胀,皮色红,皮温
变电运维管理规定中()都应安装完善的防误闭锁装置,装置应保持良好状态低压电气
某地下水池采用钢筋混凝土结构,平面尺寸6m×12m,基坑支护采用直径600mm钻
()是根据市场平均水平来确定本企业的薪酬定位的一种做法。A.混合策略 B.
下列关于组成部分重要性的说法中,错误的是( )。A.在确定组成部分重要性时,无须
根据建筑业企业资质管理规定,建筑业企业资质分为()三个序列。A.施工总承包、专
A.动作电位去极相有超射现象 B.复极时间长于去极时间 C.有复极2期平台期
最新回复
(
0
)