Engineering for sustainable development
The Greenhouse Project (Himalayan mountain region)
Problem
Short growing season because of high altitude and low【L31】________
Fresh vegetables imported by lorry or by【L32】________ , so are expensive
Need to use sunlight to prevent local plants from【L33】________
Previous programmes to provide greenhouses were【L34】________
New greenhouse
Meets criteria for sustainability
Simple and【L35】________ to build
Made mainly from local materials (mud or stone for the walls, wood and【L36】________ for the roof)
Building and maintenance done by local craftsmen
Relies solely on【L37】________energy
Only families who have a suitable【L38】________can own one
Design
Long side faces south
Strong polythene cover
Inner【L39】________ are painted black or white
Social benefits
Owners’ status is improved
Rural【L40】________ have greater opportunities
More children are educated [br] 【L38】
Good afternoon. This is the first of a series of lectures I’ll be giving about engineering for sustainable development. I’ll be presenting examples of engineering projects from a variety of contexts, and today I’m going to talk about a project to design a new kind of greenhouse for use in the Himalayan mountain regions.
First of all, I’ll tell you about the problem which was the context for this project. In the Himalayan mountains, fresh vegetables and other crops can only be grown outside for about ninety days, during the summer, because the altitude of the region is around 3500 metres, and
because the rainfall is so low.
In winter, temperatures fall below minus 25 degrees Celsius, so fresh vegetables have to be imported. They arrive by truck in summer or
by air in winter,
which makes them expensive. Local people rely on dried leafy vegetables and stored root crops during the winter, and rarely eat fresh vegetables.
But despite the sub-zero temperatures, the skies over the region are cloudless, and there are over three hundred sunny days per year. So an engineering solution was needed, to exploit the sun’s energy and
protect locally produced plants from freezing during winter.
And in fact,
there has been programmes in the past to provide greenhouses, but these were unsuccessful.
The greenhouses weren’t adapted for local conditions, so they tended to fall into disuse.
So, a few years ago, a project was initiated to design a better greenhouse, one which would meet the criteria for sustainability.
So, what are the criteria for sustainability? Well, first of all, the new greenhouse is designed to be relatively simple,
so construction is cheap.
Locally available materials are used wherever possible. The walls are generally constructed of mud bricks, made locally, although in areas of high snow-fall more resilient walls of stone are needed. Rammed earth is also used. The main roof is generally made from locally available poplar wood,
with water-resistant local grass for the covering.
In addition, the construction and maintenance of the greenhouse are done by local craftsmen. So local stone masons are employed to build the greenhouse walls, and specialised training is provided for them wherever necessary.
Then...
the greenhouse is designed to run on solar power alone,
there’s no supplementary heating. And lastly, families are selected to own one of the new greenhouses with great care.
They have to have a site which is suitable for constructing it on.
They also have to be keen to make a success of using it, and also to share the produce with the wider community through sale or barter. Potential owners are taken to see existing greenhouses before they make a final decision about having one.
So, those are the features which make the project sustainable. And now I’ll briefly describe the design of the greenhouse. The greenhouses are orientated very carefully along an East-West axis so that there’s a long south-facing side. The transparent cover on the south-facing side is made from a heavy-duty polythene, which should last for at least five years.
On the inside of the greenhouse, the walls are painted
— the rear and west-facing walls are black, to improve heat absorption, but the east-facing wall is white to reflect the morning sunlight onto the crops inside. Finally, there’s a door in the wall at one end, and vents are incorporated into the roof, the door and the wall at the other end, to enable control of humidity and prevent overheating.
I’ll turn now to the benefits which have resulted from the introduction of these new greenhouses. These benefits are of various kinds, but for now I’ll just mention the social benefits.
First of all, people who own a greenhouse gain social standing in their communities, because they provide vegetables for the wider community, for regular consumption as well as for festivals, and they also earn income. Secondly,
because in rural areas it is women who usually grow the food, the greenhouses have increased their opportunities.
They bring the benefits of improved nutrition, and increased family income, from the sale of surplus produce. And thirdly, as a result of their improved financial position, some families can now afford to educate their children for the first time.
选项
答案
site
解析
空格前为形容词suitable,推测应填入一个名词。录音原文中指出,家庭中必须要有一处合适的场所可供建造(suitable for constructing it on)。录音原文中的which is suitable for与题目中的who have a suitable为同义替换,故空格处填入site。
转载请注明原文地址:https://tihaiku.com/zcyy/3336385.html
相关试题推荐
Whatproblemsdothespeakersidentifyforthisproject?ChooseSEVENanswersfr
Whatproblemsdothespeakersidentifyforthisproject?ChooseSEVENanswersfr
Choosethecorrectletter,A,BorC.[br]Whyisthisprojectparticularlyimpo
Choosethecorrectletter,A,BorC.[br]Theywanttodothisprojectbecause
Choosethecorrectletter,A,BorC.[br]WhatistheprojectthatMarkandGin
Whatdothestudentsdecideaboutthefollowingpartsoftheproject?Writethe
Whatdothestudentsdecideaboutthefollowingpartsoftheproject?Writethe
Choosethecorrectletter,A,BorC.Projectonusingnaturaldyestocolourfa
Choosethecorrectletter,A,BorC.Projectonusingnaturaldyestocolourfa
Choosethecorrectletter,A,BorC.Projectonusingnaturaldyestocolourfa
随机试题
NarratorListentopartofatalkinalinguisticsclass.Nowgetreadytoanswe
MostAmericansspendfarmoreoftheirleisuretimewiththemassmediathan
A.减速慢行 B.注意危险 C.拥堵路段 D.事故多发路段
甲公司根据麦肯锡矩阵法为其主要业务选择发展战略,如下图,适合发展型战略的是:A.
根据单项工程的一般划分原则,下列单项工程中属于辅助生产设施的是()。A.废水
隐形义齿的排牙,为加强灌注后弹性树脂对人工牙的包裹和基托的连续,人工牙龈端近远中
防控物业管理活动中的法律风险,物业服务企业可以从()方面入手。A:增强风险意识
近代以来,世界上主要资本一帝国主义国家,几乎都曾经欺凌过中国,强迫中国签订过不平
以下关于安全边际的说法,正确的有( )。A:是任何投资活动的基础 B:就债券
进度计划调整的重点方法是( )。A.关键工作的调整 B.资源调整 C.改变某