首页
登录
职称英语
Art Murals[img]2012q1/ct_etoefm_etoeflistz_0647_20121[/img] [br] What does the i
Art Murals[img]2012q1/ct_etoefm_etoeflistz_0647_20121[/img] [br] What does the i
游客
2024-01-04
14
管理
问题
Art Murals
[br] What does the instructor mean when she says this:
W1: I know you’re all excited about our class project. But before we get started on the design of our mural, let’s review some of the technical requirements for murals. What factors do we need to keep in mind? Yes, Lydia?
W2: The mural has to be permanent. It has to last as long as the building. And it has to be sturdy enough to put up with conditions like the walls being washed.
W1: Good points. Yes, David?
M: It should have a flat finish so you can look at it from all angles without seeing any glare. And the design should be laid out so you can see it while you’re walking rather than standing still.
W1: Yes, those are all things we need to bear in mind. We want people to take in our mural—all of it—from a moving position, since they’ll be observing it as they walk through the lobby to the elevators. And let’s not forget that our mural is more than just a large-scale work of art done on a wall instead of a canvas. The term "mural" implies a distinct feeling or nature, a quality that’s appropriate to the architecture and the function of the room. A mural is an integral part of the building. If it’s painted in an existing building, like ours will be, it should be planned to fit into the architectural design, instead of giving the impression that it’s a surface decoration. Now, what are some of the technical requirements for our wall?
M: Obviously, the wall shouldn’t move. It shouldn’t shrink or settle because that could cause cracks in the paint or plaster.
W1: Yes, it’s vital that our wall be perfectly immovable. And for murals like ours—remember, our mural will be on the interior side of an exterior wall—another important requirement is that dampness should be excluded. Dampness can result from water seeping through porous materials or through joints, corners, or flaws in the building construction. When water leaks through a wall, it may dissolve the salts that are in the building materials. When the moisture dries, the salts are deposited in the form of white, moldy-looking film on the surface of the plaster. This greatly weakens the plaster, which can crumble or crack, and, of course, it’s disastrous to the mural.
W2: Can moisture make the paint peel off?
W1: Yes, it can. When moisture penetrates a wall coated with paint, it causes the plaster to expand and the paint to peel off—either in small flakes or in big pieces. And we don’t want that happening to our work, so we’ll need to take measures to prevent it. Our goal will be to reduce expansion of the plaster and to lessen the condensation of moisture on the surface. So our first rule is to exclude dampness as much as possible.
M: Don’t we also need to guard the plaster from extreme changes in temperature?
W1: Yes. So, how are we going to do this?
M: We could create an air space between the outer wall of the building and the plaster. We could do this by building a screen or, urn, like a false Wall just inside the exterior wall, and then we put the plaster for the mural on this false wall. There’d be like an inch of air space between the false wall and the exterior wall. The air space would have an insulating effect. What I mean is, it would slow down any temperature changes on the plaster.
W1: Yes, you’re correct about the insulating effect of an air space. Now, to do this—it’s called "furring" the wall—what we do is, we attach thin strips of wood to the exterior wall, and then we build another wall on top of this. The furring of the wall creates an air space of one-half to one inch between the outer and inner walls. That’s enough to protect our mural from moisture and temperature changes, as well as the mechanical strains and stresses of the wall itself.
选项
A、A building with a mural will attract a lot of visitors.
B、A mural serves the same purpose as other forms of art.
C、The term "mural" has several different meanings.
D、A mural is an expression of the building’s character.
答案
D
解析
What does the instructor mean when she says this:
"The term ’mural’ implies a distinct feeling or nature, a quality that’s appropriate to the architecture and the function of the room. A mural is an integral part of the building."
The instructor means that a mural is an expression of the building’s character. The instructor points out that the term "mural" suggests a feeling, nature, or quality that is appropriate to the architecture, and that a mural is an integral part of the building. This description relates to the essential character of the building. (2.4)
转载请注明原文地址:https://tihaiku.com/zcyy/3332173.html
相关试题推荐
NarratorListentoalectureintheliteratureclass.[img]2011q1/ct_etoefm_
NarratorListentoalectureintheliteratureclass.[img]2011q1/ct_etoefm_
NarratorListentothelectureinbusinessclass[img]2011q1/ct_etoefm_etoef
NarratorListentothelectureinbusinessclass[img]2011q1/ct_etoefm_etoef
NarratorListentothelectureinbusinessclass[img]2011q1/ct_etoefm_etoef
NarratorListentothelectureinbusinessclass[img]2011q1/ct_etoefm_etoef
[img]2011q1/ct_etoefm_etoefspeaka_0223_20111[/img]Q:Somepeoplebelievethatte
BiologyCardiacMuscle[img]2012q1/ct_etoefm_etoeflistz_0107_20121[/img][br]Lis
BiologyCardiacMuscle[img]2012q1/ct_etoefm_etoeflistz_0107_20121[/img][br]Wha
BiologyCardiacMuscle[img]2012q1/ct_etoefm_etoeflistz_0107_20121[/img][br]Why
随机试题
Completethetablebymatchingthephrasesbelow.Selecttheappropriatephrases
Theywerecaughtintheforest,and______madematterworsewasthatitkeptra
建筑工程定额就是在正常的施工条件下,为完成单位合格产品所规定的消耗标准。即建筑产
某工程的进度计划网络图如下图所示,其中包含了①~⑩10个节点,节点之间的剪线表示
关于风湿性疾病的概念下列哪种说法是对的A、风湿病、结缔组织病、胶原病均是同范畴的
初起皮肤上有粟粒样脓头,红肿热痛,病情发展则脓头增多,溃后状如蜂窝,范围在9~1
Thechangeinthatvillagewasmiraculou
商品房预售广告不得涉及的内容是( )。A.开发企业名称 B.装修装饰内容
EPQ中P量表表示( )。A.内外向 B.神经质 C.掩饰性 D.精神质
2011年1月,宁波佳杰公司(A类企业、非联网监管)与境外A公司、上海宇辰光电材
最新回复
(
0
)