首页
登录
职称英语
Problem Description of the Flood Early Warning SystemVocabulary and Expressions
Problem Description of the Flood Early Warning SystemVocabulary and Expressions
游客
2023-12-29
33
管理
问题
Problem Description of the Flood Early Warning System
Vocabulary and Expressions
physically-based algorithm deploy populace
calibrate adaptive illiterate fuse [br] The scientists have developed statistical algorithms capable of offline, distributed computation.
The Problem Description of the Flood Early Warning System
In developing countries, warning communities of an incoming flood is an expensive proposal given their limited resources. The equipment necessary for early warning flood systems is expensive and centralized to support flood detection schemes that are computationally complex. This project explores new techniques for distributing the computation of flood detection within a wireless sensor network, grounding the research in reality through the design and installation of an early warning system for flooding in a developing country.
Sensor networks for flooding do not exist in a real-time automated capacity within developing countries. We are developing such a sensor network and examining how to distribute and adapt the flood prediction calculation. Current flood prediction relies on physically-based models requiring large amounts of data in order to calibrate the model, and significant computation power to compute the model. Neither of these being feasible on a sensor network as data,storage and computing power are limited, we are working on statistical algorithms capable of online, distributed computation.
Given a suite of robust adaptive distributed algorithms for flood warning, we are planning to implement these algorithms on a system that can be deployed within a developing country. This poses a number of challenges, ranging from survival in harsh flood environments, lack of trained personnel to maintain the system, and an illiterate populace to warn. Designing and implementing a system that addresses these issues poses interesting engineering problems. Key research questions here include: How does each sensor node measure its environment? How does each sensor communicate with the rest of the network, and convey its ongoing status given the worst weather conditions possible on a river? How and where should the information from the sensors be processed and fused?
选项
A、正确
B、错误
答案
B
解析
根据原文“…we are working on statistical algorithms capable of…”判断,offline为错误,故本题表述错误。
转载请注明原文地址:https://tihaiku.com/zcyy/3315159.html
相关试题推荐
Assumingthattheengineeringproblemscouldbeovercome,theproductionof
Assumingthattheengineeringproblemscouldbeovercome,theproductionof
Assumingthattheengineeringproblemscouldbeovercome,theproductionof
Assumingthattheengineeringproblemscouldbeovercome,theproductionof
Assumingthattheengineeringproblemscouldbeovercome,theproductionof
Theonlyproblemwiththedebatelastweekwasthatthebeginningsoundedmorel
Theonlyproblemwiththedebatelastweekwasthatthebeginningsoundedmorel
Hisemotionalproblems______fromhisexperiencesasachild,Ithink.A、stemB、fl
Nuclearpower,withallitsinherentproblems,isstilltheonlyoptiontoguara
Theonlyproblemwiththedebatelastweekwasthatthebeginningsoundedmorel
随机试题
Clarkfeltthathis______inoneofthemostdramaticmedicalexperimentsofal
【B1】[br]【B6】[audioFiles]audio_eufm_j01_322(200910)[/audioFiles]stimulate句意推断题
MayraAvilaislookingforwardtoherhighschoolprom.Avila,18,theWest
牙种植术的概念正确的是A.将未发育完成的牙胚植入牙槽骨内的手术 B.将人工牙植
《精神药品管理办法》规定,精神药品分为第一类和第二类的依据是A、对中枢神经系统兴
检测外周血致敏T细胞与下列变态反应有关的是A.Ⅰ型B.Ⅱ型C.Ⅲ型D.Ⅳ型E.Ⅰ
Thechangeinthatvillagewasmiraculou
A.0 B. C. D.
社会主义新农村建设的中心环节是( )。A.生产发展 B.生活宽裕 C.乡风
(2020年真题)经济波动周期对商业银行经营状况的影响主要有()。A.在衰
最新回复
(
0
)