首页
登录
职称英语
Problem Description of the Flood Early Warning SystemVocabulary and Expressions
Problem Description of the Flood Early Warning SystemVocabulary and Expressions
游客
2023-12-29
57
管理
问题
Problem Description of the Flood Early Warning System
Vocabulary and Expressions
physically-based algorithm deploy populace
calibrate adaptive illiterate fuse [br] The scientists have developed statistical algorithms capable of offline, distributed computation.
The Problem Description of the Flood Early Warning System
In developing countries, warning communities of an incoming flood is an expensive proposal given their limited resources. The equipment necessary for early warning flood systems is expensive and centralized to support flood detection schemes that are computationally complex. This project explores new techniques for distributing the computation of flood detection within a wireless sensor network, grounding the research in reality through the design and installation of an early warning system for flooding in a developing country.
Sensor networks for flooding do not exist in a real-time automated capacity within developing countries. We are developing such a sensor network and examining how to distribute and adapt the flood prediction calculation. Current flood prediction relies on physically-based models requiring large amounts of data in order to calibrate the model, and significant computation power to compute the model. Neither of these being feasible on a sensor network as data,storage and computing power are limited, we are working on statistical algorithms capable of online, distributed computation.
Given a suite of robust adaptive distributed algorithms for flood warning, we are planning to implement these algorithms on a system that can be deployed within a developing country. This poses a number of challenges, ranging from survival in harsh flood environments, lack of trained personnel to maintain the system, and an illiterate populace to warn. Designing and implementing a system that addresses these issues poses interesting engineering problems. Key research questions here include: How does each sensor node measure its environment? How does each sensor communicate with the rest of the network, and convey its ongoing status given the worst weather conditions possible on a river? How and where should the information from the sensors be processed and fused?
选项
A、正确
B、错误
答案
B
解析
根据原文“…we are working on statistical algorithms capable of…”判断,offline为错误,故本题表述错误。
转载请注明原文地址:https://tihaiku.com/zcyy/3315159.html
相关试题推荐
Assumingthattheengineeringproblemscouldbeovercome,theproductionof
Assumingthattheengineeringproblemscouldbeovercome,theproductionof
Assumingthattheengineeringproblemscouldbeovercome,theproductionof
Assumingthattheengineeringproblemscouldbeovercome,theproductionof
Assumingthattheengineeringproblemscouldbeovercome,theproductionof
Theonlyproblemwiththedebatelastweekwasthatthebeginningsoundedmorel
Theonlyproblemwiththedebatelastweekwasthatthebeginningsoundedmorel
Hisemotionalproblems______fromhisexperiencesasachild,Ithink.A、stemB、fl
Nuclearpower,withallitsinherentproblems,isstilltheonlyoptiontoguara
Theonlyproblemwiththedebatelastweekwasthatthebeginningsoundedmorel
随机试题
Itmaysomedaybeworthwhiletotrytorecoveruraniumfromseawater,butatpre
MasstransportationrevisedthesocialandeconomicfabricoftheAmericanc
抽样定理是采样频率fs大于或等于被采样信号最高频率fH的3倍时,就可把采样信号不
联系实际,谈谈在教育教学中如何培养学生的创造性。
国家外汇管理局设定禁止QFII资金汇出境外的期限,即投资本金锁定期,其中规定养老
以下项目中不属于病态舌形内容的为A.胖大舌 B.肿胀舌 C.点刺舌 D.裂
对存货进行实地监盘时,审计人员应当()。A.安排盘点计划,对盘点的结果负责 B
物业服务合同约定以外的特约服务合同,属于()合同的范畴。A:单务 B:双务
关于紧急避险,下列说法正确的是?A.甲、乙、丙三人持刀抢劫一对情侣丁和戊(女),
下列关于概算定额与预算定额的表述,正确的是( )。A.预算定额的编制较概算定额简
最新回复
(
0
)