首页
登录
职称英语
Problem Description of the Flood Early Warning SystemVocabulary and Expressions
Problem Description of the Flood Early Warning SystemVocabulary and Expressions
游客
2023-12-29
30
管理
问题
Problem Description of the Flood Early Warning System
Vocabulary and Expressions
physically-based algorithm deploy populace
calibrate adaptive illiterate fuse [br] The scientists are testing how to distribute and adapt the flood prediction calculation.
The Problem Description of the Flood Early Warning System
In developing countries, warning communities of an incoming flood is an expensive proposal given their limited resources. The equipment necessary for early warning flood systems is expensive and centralized to support flood detection schemes that are computationally complex. This project explores new techniques for distributing the computation of flood detection within a wireless sensor network, grounding the research in reality through the design and installation of an early warning system for flooding in a developing country.
Sensor networks for flooding do not exist in a real-time automated capacity within developing countries. We are developing such a sensor network and examining how to distribute and adapt the flood prediction calculation. Current flood prediction relies on physically-based models requiring large amounts of data in order to calibrate the model, and significant computation power to compute the model. Neither of these being feasible on a sensor network as data,storage and computing power are limited, we are working on statistical algorithms capable of online, distributed computation.
Given a suite of robust adaptive distributed algorithms for flood warning, we are planning to implement these algorithms on a system that can be deployed within a developing country. This poses a number of challenges, ranging from survival in harsh flood environments, lack of trained personnel to maintain the system, and an illiterate populace to warn. Designing and implementing a system that addresses these issues poses interesting engineering problems. Key research questions here include: How does each sensor node measure its environment? How does each sensor communicate with the rest of the network, and convey its ongoing status given the worst weather conditions possible on a river? How and where should the information from the sensors be processed and fused?
选项
A、正确
B、错误
答案
A
解析
该表述是对原文相关内容的同义表述,因此本题正确。
转载请注明原文地址:https://tihaiku.com/zcyy/3315157.html
相关试题推荐
Theproblemsthemselvesarestillnottrulystrategicbecausetheoperationoft
Stopdwellingonyourproblemsanddosomethingaboutthem!A、abidingB、lingering
[originaltext]Anotherproblemwithchildreninvolvedischildabuse.Child
[originaltext]Anotherproblemwithchildreninvolvedischildabuse.Child
[originaltext]Anotherproblemwithchildreninvolvedischildabuse.Child
WhatdoesthespeakerthinkaboutPeter’sopinionoftheproblem?[br][origina
WhatdoesthespeakerthinkaboutPeter’sopinionoftheproblem?[originaltext]
IMF’sConcernaboutZimbabwe’sEconomyVocabularyandExpressionsInternational
IMF’sConcernaboutZimbabwe’sEconomyVocabularyandExpressionsInternational
IMF’sConcernaboutZimbabwe’sEconomyVocabularyandExpressionsInternational
随机试题
[originaltext]M:Cindy!Haveyouheardthenews?W:No,Steve.Whatdoyoumean
[originaltext]M:Hi,Shelley.Comeonin.W:Uh,yeah,Istoppedbytoseeify
TheultimatecauseoftheCivilWarwasthebombardmentofFortSumter.A、onlyB、
[originaltext]W:Nigel,whatkindofmistakesdoinexperiencedtravelersmake?
Thespeakertellsthestudentsthattheyarenotlikelytosucceedifthey[orig
下列属涩脉临床意义的是( )。A.惊恐,疼痛 B.里证,寒证 C.疝气,阴
患者,女性,30岁。因紧张、烦躁、坐立不安、心悸、气急、怕死而入院,10个月前出
学校实现教育培养人的目的的基本途径是( )。 A.政治思想品德教育 B.教
工程总费用由直接费用和间接费用两部分组成,当工期被压缩时,会引起()。A.直接费
发电厂的屋外配电装置周围围栏高度不低于下列哪个数值?()A.1200mm B
最新回复
(
0
)