首页
登录
职称英语
Problem Description of the Flood Early Warning SystemVocabulary and Expressions
Problem Description of the Flood Early Warning SystemVocabulary and Expressions
游客
2023-12-29
57
管理
问题
Problem Description of the Flood Early Warning System
Vocabulary and Expressions
physically-based algorithm deploy populace
calibrate adaptive illiterate fuse [br] Developing countries have developed sensor networks for flooding with real-time automated capacity.
The Problem Description of the Flood Early Warning System
In developing countries, warning communities of an incoming flood is an expensive proposal given their limited resources. The equipment necessary for early warning flood systems is expensive and centralized to support flood detection schemes that are computationally complex. This project explores new techniques for distributing the computation of flood detection within a wireless sensor network, grounding the research in reality through the design and installation of an early warning system for flooding in a developing country.
Sensor networks for flooding do not exist in a real-time automated capacity within developing countries. We are developing such a sensor network and examining how to distribute and adapt the flood prediction calculation. Current flood prediction relies on physically-based models requiring large amounts of data in order to calibrate the model, and significant computation power to compute the model. Neither of these being feasible on a sensor network as data,storage and computing power are limited, we are working on statistical algorithms capable of online, distributed computation.
Given a suite of robust adaptive distributed algorithms for flood warning, we are planning to implement these algorithms on a system that can be deployed within a developing country. This poses a number of challenges, ranging from survival in harsh flood environments, lack of trained personnel to maintain the system, and an illiterate populace to warn. Designing and implementing a system that addresses these issues poses interesting engineering problems. Key research questions here include: How does each sensor node measure its environment? How does each sensor communicate with the rest of the network, and convey its ongoing status given the worst weather conditions possible on a river? How and where should the information from the sensors be processed and fused?
选项
A、正确
B、错误
答案
B
解析
根据原文“…do not exist in a real-time automated capacity within developing countries”判断,本题表述错误。
转载请注明原文地址:https://tihaiku.com/zcyy/3315156.html
相关试题推荐
Theproblemsthemselvesarestillnottrulystrategicbecausetheoperationoft
Stopdwellingonyourproblemsanddosomethingaboutthem!A、abidingB、lingering
[originaltext]Anotherproblemwithchildreninvolvedischildabuse.Child
[originaltext]Anotherproblemwithchildreninvolvedischildabuse.Child
[originaltext]Anotherproblemwithchildreninvolvedischildabuse.Child
WhatdoesthespeakerthinkaboutPeter’sopinionoftheproblem?[br][origina
WhatdoesthespeakerthinkaboutPeter’sopinionoftheproblem?[br][origina
IMF’sConcernaboutZimbabwe’sEconomyVocabularyandExpressionsInternational
IMF’sConcernaboutZimbabwe’sEconomyVocabularyandExpressionsInternational
IMF’sConcernaboutZimbabwe’sEconomyVocabularyandExpressionsInternational
随机试题
[img]2016m3x/ct_eyyjsbz2014j_eyyjsbd_0305_20163[/img]ITAIPUDAM:Vi
()亚洲司司长()执行秘书[br]()总理()审判长L,B
I’minterestedinthecriminal【B1】______systemofourcountry.Itseemstom
甲公司是一家粮食加工公司,加工经营具有地方特色的绿色大米、杂粮等粮食产品,主要市
某患者骨髓有核细胞分类:原始单核细胞86%,有核红细胞10%,其他细胞4%,应该
下列哪些神经通过眶上裂()A.眼神经 B.动眼神经 C.视神经 D.滑
假设银行的法定存款准备金比率为12%,如果银行的存款准备金总额为1亿元,则存款总
《中国药典》中测定昆明山海棠片中总生物碱的含量采用的方法是A.萃取法 B.酸碱
土木工程建筑项目可在安装工程内附带投保,但其保险金额超过整个安装工程保额的(
根据《建设工程施工专业分包合同(示范文本)》,关于专业工程分包人的说法,正确的是
最新回复
(
0
)