首页
登录
职称英语
Problem Description of the Flood Early Warning SystemVocabulary and Expressions
Problem Description of the Flood Early Warning SystemVocabulary and Expressions
游客
2023-12-29
7
管理
问题
Problem Description of the Flood Early Warning System
Vocabulary and Expressions
physically-based algorithm deploy populace
calibrate adaptive illiterate fuse [br] The expensive equipment necessary for early warning flood systems is centralized to support computationally complex flood detection schemes.
The Problem Description of the Flood Early Warning System
In developing countries, warning communities of an incoming flood is an expensive proposal given their limited resources. The equipment necessary for early warning flood systems is expensive and centralized to support flood detection schemes that are computationally complex. This project explores new techniques for distributing the computation of flood detection within a wireless sensor network, grounding the research in reality through the design and installation of an early warning system for flooding in a developing country.
Sensor networks for flooding do not exist in a real-time automated capacity within developing countries. We are developing such a sensor network and examining how to distribute and adapt the flood prediction calculation. Current flood prediction relies on physically-based models requiring large amounts of data in order to calibrate the model, and significant computation power to compute the model. Neither of these being feasible on a sensor network as data,storage and computing power are limited, we are working on statistical algorithms capable of online, distributed computation.
Given a suite of robust adaptive distributed algorithms for flood warning, we are planning to implement these algorithms on a system that can be deployed within a developing country. This poses a number of challenges, ranging from survival in harsh flood environments, lack of trained personnel to maintain the system, and an illiterate populace to warn. Designing and implementing a system that addresses these issues poses interesting engineering problems. Key research questions here include: How does each sensor node measure its environment? How does each sensor communicate with the rest of the network, and convey its ongoing status given the worst weather conditions possible on a river? How and where should the information from the sensors be processed and fused?
选项
A、正确
B、错误
答案
A
解析
该表述是对原文“The equipment necessary for early warning flood systems is expensive and centralized to support flood detection schemes that are computationally complex”的同义表述,因此本题正确。
转载请注明原文地址:https://tihaiku.com/zcyy/3315154.html
相关试题推荐
Thelocalgovernmentleadersaremakingeveryeffortto_________theproblemof
Tomcreditshisfatherforhis_________withtheresearchofsocialproblems.A、oc
Stopdwellingonyourproblemsanddosomethingaboutthem!A、abidingB、lingering
[originaltext]Anotherproblemwithchildreninvolvedischildabuse.Child
WhatdoesthespeakerthinkaboutPeter’sopinionoftheproblem?[br][origina
WhatdoesthespeakerthinkaboutPeter’sopinionoftheproblem?[br][origina
IMF’sConcernaboutZimbabwe’sEconomyVocabularyandExpressionsInternational
IMF’sConcernaboutZimbabwe’sEconomyVocabularyandExpressionsInternational
IMF’sConcernaboutZimbabwe’sEconomyVocabularyandExpressionsInternational
IMF’sConcernaboutZimbabwe’sEconomyVocabularyandExpressionsInternational
随机试题
Yourexplanationisclearand______.A、tothepointB、atthepointC、acaseinpo
(2017年真题)下列关于独立性要求的说法中,正确的是()。A.资产评估机构在
在主景的前面或两侧添加建筑物或植物的构景手法叫作( )。A.抑景 B.添景
磺脲类药物最常见的不良反应是A.甲状腺功能低下 B.凝血功能障碍 C.胃肠不
依法批准的流域规划中确定的大中型水利水电工程建设项目的用地,应当纳入()。A.
下列药物口服无抗惊厥作用的是A.苯巴比妥B.佐匹克隆C.异戊巴比妥D.地西泮E.
夏天午后的课堂上。有学生昏昏欲睡了。下列处理方式,最恰当的一项是( )。A.马上
符合B型慢性萎缩性胃炎的是A.抗内因子抗体阳性 B.胃酸分泌减少 C.血清壁
某投机者预测3月份铜期货合约价格会上涨,因此他以7800美元/吨的价格买入3手(
卵巢的良性肿瘤是A、无性细胞瘤 B、卵泡膜细胞瘤 C、颗粒细胞瘤 D、库肯
最新回复
(
0
)