首页
登录
职称英语
从前有个愚人,有一天想上市去买双新鞋。他便先用尺子把脚量了量。拿了根稻秆,记下尺码。可是因为急于赶路,把稻秆忘在家里了。他来到市上,找到了卖鞋的摊子,摸
从前有个愚人,有一天想上市去买双新鞋。他便先用尺子把脚量了量。拿了根稻秆,记下尺码。可是因为急于赶路,把稻秆忘在家里了。他来到市上,找到了卖鞋的摊子,摸
游客
2023-12-19
7
管理
问题
从前有个愚人,有一天想上市去买双新鞋。他便先用尺子把脚量了量。拿了根稻秆,记下尺码。可是因为急于赶路,把稻秆忘在家里了。他来到市上,找到了卖鞋的摊子,摸了摸口袋,记尺码的稻秆不见了,就对卖鞋的说:“尺码忘在家里了,不晓得大小,让我回家拿尺码去!”说罢,拔腿就跑。他急急忙忙回家拿了那根稻秆,又急急忙忙赶回市上来,一来一去,花了很多时间。等他赶回市上,天已晚了,集市已经散了。他白忙了一阵,还是没有买到鞋子。那时,有人问他:“你是给自己买鞋子,还是替别人代买?”愚人回答说:“我自己穿的呀!”那人又问他:“那么,你身上不是长着脚么?又何必带尺码呢!”
选项
答案
A Foolish Man Buys Shoes
There was once a foolish man. One day he wanted to go to the market to buy a pair of new shoes. He first measured his foot with a ruler and then took a piece of straw and marked the length of his foot on it. But he was in such a hurry to set off that he left the straw at home.
At the market, having found a shoe-stall, he felt in his pockets only to find that the straw was not there. So he said to the shoe-maker, "I’ve left the measurement at home, so I do not know the size. I have to go back for it." With these words, he hurried off.
He hurried home for the straw and then hurried back to the market again. The trip home and back took him a lot of time. By the time he reached the market, it was almost dark and the market was already over. He had gone to all this trouble for nothing and still had not managed to buy the shoes.
Then someone asked him," Did you want to buy the shoes for yourself or for someone else?"
He answered," For myself, of course!"
The man then asked him," Well, but haven’t you brought your feet with you! What do you need to bring the measurement for?"
解析
转载请注明原文地址:https://tihaiku.com/zcyy/3285955.html
相关试题推荐
随机试题
Abluesedannearlysideswipesmycar.Thedrivergivesmeaweirdlook.No
Peoplethroughouttheworldareeating______meatperpersonastheydidin1950.
【B1】[br]【B20】A、coherentB、indicativeC、originalD、certainD词义辨析。A连贯的,B指示的,C原来的
按照我国《刑事诉讼法》的规定,犯罪嫌疑人、被告人除自己行使辩护权以外,还可以委托
C
患儿女,1岁。全身皮肤发绀,可见忤状指,喜欢采用蹲姿游戏。错误的护理措施是()
下面不属于操作系统管理功能的是()。 A.存储管理B.文件管理C.设备管理
下列不属于基坑工程支护结构检测内容的有( )。A.对立柱沉降、抬起的监测 B.
甲企业与乙银行签订一份50万元的贷款合同(未明确债务履行期间、未明确保证方式),
关于工程量清单中的项目特征描述,下列表述正确的是()。A.应符合工程量计算
最新回复
(
0
)