首页
登录
职称英语
A broad public discussion of environmental problems began in the mid-1980s,
A broad public discussion of environmental problems began in the mid-1980s,
游客
2023-12-01
43
管理
问题
A broad public discussion of environmental problems began in
the mid-1980s, when the first "green" groups formed in opposition
to Erevan’s intense industrial air pollution and to nuclear power
generation in wake of the 1986 reactor explosion at Chernobyl.【S1】______
Environmental issues helped form the basis of the nationalist
independence movement when environmental demonstrations
subsequently merged with these for other political causes in the【S2】______
late 1980s.
In independent Armenia, environmental issues divide society
into those who fear of "environmental time bombs" and those who【S3】______
view resumption of pollution-prone industrial operations as the only
mean of improving the country’s economy. In the early 1990s, the【S4】______
latter group blamed Armenia’s economic woes on a role played by【S5】______
the former in closing major industries.
In 1994 three national environmental laws were in effect: the
Law on Environmental Protection, the Basic Law on the
Environment, and the Law on Mineral Resources. The Council of
Ministers, Armenia’s cabinet, includes a minister of the
environment. Therefore, no comprehensive environmental protection【S6】______
program has emerged, and decisions on environmental policy have
been made on an ad hoc basis.
Environmental conditions in Armenia have been worsened by
the Azerbaijani blockade of supplies and electricity from outside.
The results of the blockade and the failure of diplomatic efforts to lift
it led the government propose reconstruction of the Armenian Atomic【S7】______
Power Station at Metsamor, which was closed after the 1988
earthquake because of its location in an earthquake-prone area and
what had the same safety problems as reactors listed as dangerous in【S8】______
Bulgaria, Russia, and Slovakia. After heating debates over startup【S9】______
continued through 1993, French and Russian nuclear consultants
declared operating conditions basically safe. Continuation of the
blockade into 1994 gave added emergency to the decision.【S10】______ [br] 【S5】
选项
答案
a一the
解析
冠词误用。该处role被后置定语played by the former in closing major industries修饰,可见其为特指,故将不定冠词a改为定冠词the。
转载请注明原文地址:https://tihaiku.com/zcyy/3233866.html
相关试题推荐
Today,Iamgoingtoidentifysometypicalresearchproblemsandalsoshare
Today,Iamgoingtoidentifysometypicalresearchproblemsandalsoshare
Today,Iamgoingtoidentifysometypicalresearchproblemsandalsoshare
Oneoftheobviousproblemswithpredictingthefutureeffectsofclimatech
Oneoftheobviousproblemswithpredictingthefutureeffectsofclimatech
Thesuddendeathofanadmiredpublicpersonalwaysseemsanimpossibility.
Thesuddendeathofanadmiredpublicpersonalwaysseemsanimpossibility.
"Artdoesnotsolveproblems,butmakesusawareoftheirexistence,"sculp
"Artdoesnotsolveproblems,butmakesusawareoftheirexistence,"sculp
"Artdoesnotsolveproblems,butmakesusawareoftheirexistence,"sculp
随机试题
Inthispart,youareaskedtowriteacompositiononthetitleof"EffectofRe
Lookatthefollowingstatements(Questions8-11)andthelistofpeoplebelow.Ma
消防水泡灭火系统由()等组成。A.消防水泡 B.控制装置 C.消防水泵
隋炀帝继位后,利用包括鸿沟在内的旧有河道,修建了大运河。大运河以洛阳为中心,北到
在学习“尿的形成与排出”这一内容时,为确保教学进度,教师只选择平时表现较好的学生
设某铁路局2010年日均装车5626车,日均卸车6300车,日均接运重车7357
"病人仰卧在躺椅上畅所欲言,治序者在倾听和释问中解释病人的潜意识、情绪或幼年的特
(2021年真题)公司为减少注册资本而收购本公司股份后,应当自收购之日起()内
建设工程项目总概算的完整组成是()。A.单项工程综合概算、工程建设其他费用
根据《建设工程工程量清单计价规范》(GB50500-2013)的规定,下列有关
最新回复
(
0
)