I: Good morning, ladies and gentlemen. Today we are greatly honored to have Mr. Alan Gibbons, an inspector from the Australian Industrial Bureau to introduce us an important stage in the production process - quality control. Well, Alan.
A: Good morning everyone.
I: Alan, it is believed that an effective quality control system amounts to an inspection of the finished product. Is that right?
A: It is true in certain aspects. However, it has got problems. The main drawback with a finished product inspection is that it is an "after the act" operation. You know, no amount of inspection can make bad work good at this stage.
I: Then when is the ideal time for quality control?
A: Most large scale manufacturers consider quality control to be an ongoing process. The advantages of this are considerable. It cuts wastage, it saves time, as no hours are lost on work done on already defective items, and perhaps most importantly, it is easier to detect a fault, when the product is still at the component stage.
I: That’s reasonable. So what should quality control begin with?
A: Well, usually with raw materials. If the materials are of sub-standard materials there is no point in processing them. More to the point, sub-standard materials can be returned to the company at no cost to the manufacturer.
I: Mm, this is obvious.
A: Although these benefits seem obvious, you might be surprised to know that only 87% of large firms and 62% of small firms have a standard raw material inspection procedure. For the same reasons, it is a good idea to test components brought in from another company.
I: I see. After that, what should be inspected?
A: In many manufacturing processes, it is useful to carry out some form of quality control on products while they are still being manufactured. It is often easier to check individual components before assembly takes place. Equally, it may be valuable to test components by their function. I suppose the bottom line is that every product and every company has its own requirements and the quality control programme should be arranged accordingly.
I: So if each component functions well, the entire product comes out right.
A: Exactly.
I: Then what are we testing for? I mean do we test the same things out of different products or do we test differently?
A: Of course this depends on the product, too. An expensive car has different requirements from a cheap plastic toy. However, in both cases the most vital testing is for safety.
1. What is the main disadvantage of finished product inspection ?
2. Which one is NOT the advantage of keeping quality control as an ongoing process ?
3. What should quality control begin with?
4. What are the percentages of large firms and small firms in terms of standard raw material inspection procedure?
5. What is the most vital aspect in testing?
选项
A、26% and 78%.
B、62% and 87%.
C、78% and 26%.
D、87% and 62%.
答案
D
解析
录音中提到:Although these benefits seem obvious,you might be surprised to know that only 87% of large firms and 62% of small firms have a standard raw material inspection procedure.只有87%的大公司和62%的小公司有标准的原材料检验程序。因此答案是选项D。
转载请注明原文地址:https://tihaiku.com/zcyy/3220709.html
相关试题推荐
[originaltext]M:OK,soifyou’rereadytotaketheplunge,ifyouwannagetou
[originaltext]M:OK,soifyou’rereadytotaketheplunge,ifyouwannagetou
[originaltext]M:OK,soifyou’rereadytotaketheplunge,ifyouwannagetou
[originaltext]M:OK,soifyou’rereadytotaketheplunge,ifyouwannagetou
[originaltext]M:IfyoulookatanylistofNewYear’sresolutionsyouwouldn’t
[originaltext]M:IfyoulookatanylistofNewYear’sresolutionsyouwouldn’t
[originaltext]M:IfyoulookatanylistofNewYear’sresolutionsyouwouldn’t
[originaltext]M:Howdifferentwouldyouimaginethelearningofasecondlangu
[originaltext]M:Howdifferentwouldyouimaginethelearningofasecondlangu
[originaltext]M:TodaywehaveProfessorSnowinourstudio.She’sanexperton
随机试题
DuringWorldWarII,Maltamanagedto______mostofItalianandGermanbombersb
OnthedaytheDailyExpressannounces:"Thesecrettowhyhumansgrowoldh
旅行社电子商务的特点包括()。A.广泛性 B.经济性 C.便利性 D.
根据发电效益进行工程等别划分,当装机容量小于1万kW时,工程属于()等工程。
实行会员分级结算制度的期货交易所只向()收取保证金。A、普通会员 B、非结算
共用题干 患者男性,52岁。糖尿病史5年,1周来低热37.8℃,伴咳嗽,痰中偶
社会工作者小孙在某流动人口聚居区开展社会工作服务,旨在提升社区流动人口融合社会支
A.药品通用名称 B.药品商品名称 C.注册商标 D.生物制品有效期的标注
《东北地区振兴规划》提出的限制开发区域有()A:大兴安岭、小兴安岭、长白山森林生
工程质量控制的监控主体主要包括( )。A.政府 B.施工单位 C.工程监理
最新回复
(
0
)