The Alaska Pipeline
The Alaska pipeline starts at the frozen edge of the Arctic Ocean. It stretches southward across the largest and northernmost state in the United States, ending at a remote ice-free seaport village nearly 800 miles from where it begins. It is massive in size and extremely complicated to operate.
The steel pipe crosses windswept plains and endless miles of delicate tundra that tops the frozen ground. It weaves through crooked canyons, climbs sheer mountains, plunges over rocky crags, makes its way through thick forests, and passes over or under hundreds of rivers and streams. The pipe is 4 feet in diameter, and up to 2 million barrels ( or 84 million gallons) of crude oil can be pumped through it daily. Resting on H-shaped steel racks called "bents," long sections of the pipeline follow a zigzag course high above the frozen earth. Other long sections drop out of sight beneath spongy or rocky ground and return to the surface later on. The pattern of the pipeline’s up-and-down route is determined by the often harsh demands of the arctic and subarctic climate, the tortuous lay of the land, and the varied compositions of soil, rock, or permafrost (permanently frozen ground). A little more than half of the pipeline is elevated above the ground. The remainder is buried anywhere from 3 to 12 feet, depending largely upon the type of terrain and the properties of the soil.
One of the largest in the world, the pipeline cost approximately $8 billion and is by far the biggest and most expensive construction project ever undertaken by private industry. In fact, no single business could raise that much money, so 8 major oil companies formed a consortium in order to share the costs. Each company controlled oil rights to particular shares of land in the oil fields and paid into the pipeline-construction fund according to the size of its holdings. Today, despite enormous problems of climate, supply shortages, equipment breakdowns, labor disagreements, treacherous terrain, a certain amount of mismanagement, and even theft, the Alaska pipeline has been completed and is operating. [br] The passage primarily discusses the pipeline’s _________.
选项
A、operating costs
B、employees
C、consumers
D、construction
答案
D
解析
通观全文,B、C两项并未提及,因此可先排除;A项是operating costs,而文中只提及了建设费用巨大,因此也可排除。文章主要讨论了输油管建设中解决的问题,因此D项正确。
转载请注明原文地址:https://tihaiku.com/zcyy/3211598.html
相关试题推荐
TheAlaskaPipelineTheAlaskapipelinesta
TheAlaskaPipelineTheAlaskapipelinesta
TheAlaskaPipelineTheAlaskapipelinesta
TheAlaskaPipelineTheAlaskapipelinesta
随机试题
Globalizationisthe______economictrendofourage.Almostallbusinessestoda
What’saUniversityEducationWorth?I.Studentsgraduatin
[originaltext]Inthecity’shistoricFrenchQuarterandtheGardenDistrict
清代浙西词派的代表人物是()A.朱彝尊 B.陈维崧 C.周济 D.张惠言
当圆的直径过小时,可以用线实线来代替线点画线。()
参苓白术散中除人参、茯苓、白术、甘草和桔梗外,尚有()A.黄芪、当归、陈皮
《中小学教育质量综合评价指标框架(试行》中属于“学业发展水平”评价指标的有(
《中共中央关于全面推进依法治国若干重大问题的决定》中提出了全面依法治国的基本原则
银行承兑汇票的承兑银行,应当按照票面金额向出票人收取()的手续费。A:千分之一
最新回复
(
0
)