首页
登录
职称英语
It was not until midnight ______ the snowcapped peak.A、that they sightedB、that
It was not until midnight ______ the snowcapped peak.A、that they sightedB、that
游客
2023-11-19
21
管理
问题
It was not until midnight ______ the snowcapped peak.
选项
A、that they sighted
B、that they did not sight
C、did they sight
D、had they sighted
答案
A
解析
此句是个强调句型,that 从句不需要倒装,因此正确答案是A。
转载请注明原文地址:https://tihaiku.com/zcyy/3201564.html
相关试题推荐
Mendifferfromanimals______theycanthinkandspeak.A、forwhichB、forthatC
Itwasnotuntilmidnight______thesnowcappedpeak.A、didtheysightB、thatthe
Itwasnotuntilmidnight______thesnowcappedpeak.A、thattheysightedB、that
Thoughitwasalreadymidnight,______hecontinuedtoworkhard.A、butB、yetC、an
Itwasnotuntilmidnight______thesnowcappedpeak.A、thattheysightedB、that
WhichofthefollowingsentencesisCORRECT?A、Thepartyendedataboutmidnight.
随机试题
FriendsA)Onmyrecenttravels,Icametorealiz
WhatistheRepublicofIrelandcalledinIrish?A、Irea.B、Aire.C、Eare.D、Eire.
2014年10月9日教育部公布《关于建立健全高校师德建设长效机制的意见》,划出高
在长度为n的顺序表中,求第i个元素的直接前驱,算法的时间复杂度为0(1)。()
某公司要把4个有关能源工程项目承包给4个互不相关的外商投标者,规定每个承包商只能
A.十枣汤 B.大陷胸汤 C.苇茎汤 D.泻白散 E.瓜蒌薤白白酒汤主治
下列不是灭火器选择应考虑的因素是()。A.灭火器配置场所的火灾种类 B.灭火
在工程网络计划费用优化过程中,如果被压缩对象的直接费用率大于工程间接费用率,则说
患者女,38岁。活动后心悸、气喘1年余。查体:轻度贫血,心率快,律整,胸骨右缘第
下列影响建设工程项目实施的风险因素中,属于技术风险的是()。A.气象条件 B
最新回复
(
0
)