首页
登录
职称英语
There are two main things that make aircraft engineering difficult, the need
There are two main things that make aircraft engineering difficult, the need
游客
2023-11-15
18
管理
问题
There are two main things that make aircraft engineering difficult, the need to make every component as reliable as possible and the need to build everything as light as possible. The fact that an airplane is up in the air and cannot stop if anything goes wrong, makes it perhaps a matter of life or death that its performance is absolutely dependable.
Given a certain power of engine, and consequently a certain fuel consumption, there is a practical limit to the total weight of an aircraft that can be made to fly. Out of that weight as much as possible is wanted for fuel, radio navigational instruments, passenger seats, or freight room, and of course, the passengers or freight themselves. So the structure of the aircraft has to be as small and light as safety and efficiency will allow." The designer must calculate the normal load that each part will bear. This specialist is called the "stress man". He takes account of any unusual stress that may be put on the part as a precaution against errors in manufacture, accidental damage, etc.
The stress man’s calculations go to the designer of the part, and he must make it as strong as the stress man says is necessary. One or two samples are always tested to prove that they are as strong as the designer intended. Each separate part is tested, then a whole assembly—for example, a complete wing, and finally the whole aeroplane. When a new type of aeroplane is being made, normally only one of the first three made will be flown. Two will be destroyed on the ground in structural tests. The third one will be tested in the air.
When a plane has passed all the tests it can get a government certificate of airworthiness, without which it is illegal to fly, except for test flying.
Making the working parts reliable is as difficult as making the structure strong enough. The flying controls, the electrical equipment, the fire precautions, etc. must not only be light in weight, but must work both at high altitudes where the temperature may be below freezing point and in the hot air of an airfield in the tropics.
To solve all these problems the aircraft industry has a large number of research workers, with elaborate laboratories and test houses, and new materials to give the best strength in relation to weight are constantly being tested. [br] The first three aeroplanes of a new type______.
选项
A、are only for show
B、are all destroyed
C、are later broken up for spare parts
D、are used for testing purposes
答案
D
解析
本题询问细节。根据“the first three aeroplanes of anew type”可在第三段找到相关信息,即“When a new type of aeroplane is being made,normally only one of the first three made will be flown.Two will be destroyed on the ground in structural tests.The third one will be tested in the
转载请注明原文地址:https://tihaiku.com/zcyy/3187917.html
相关试题推荐
Thenewmanagerhadmanydifficultiestoovercomebuthetookthemallinhis___
In"Hewouldoftendiscussthingswithme,askingmyopinionanddisagreeingwhe
Idon’tliketobuythingswithalabelof"thelatesttechnology",sincetheya
Althoughthecompanystillhassomedifficulties,thedirector’sreportendedon
It’san_____difficultproblem,whichevenmanyprofessionalscannotworkout.A、e
______isthecenterofourplanetarysystemwasadifficultconcepttograspin
______isthecenterofourplanetarysystemwasadifficultconcepttograspin
______foryouhelp,we’dneverhavebeenabletogetoverthedifficulties.A、H
Inthedigitalrealm,thingsseemalwaystohappenthewrongwayround.Wher
Inthedigitalrealm,thingsseemalwaystohappenthewrongwayround.Wher
随机试题
Tomorrowafamousprofessorwillbeinvited(give)______usaspeechonhowtol
ForAmericans,timeismoney.Theysay,"youonlygetsomuchtimeinthisl
Completethetablebelow.WriteONEWORDONLYforeachanswer.[img]2017m4x/ct_e
氰化物中毒抑制的是A.细胞色素c B.细胞色素b C.辅酶Q D.细胞色素
随着科技的发展,我国的芯片技术也飞速提升,( )A.麒麟990 B.骁龙86
在分析影响借款人还款能力的非财务因素时,可以通过()查阅借款人的不良记录,
甲的画作《梦》于1960年发表。1961年3月4日甲去世。甲的唯一继承人乙于20
关于刑法解释,下列哪一选项是错误的?()A.学理解释中的类推解释结论,纳入司法
根据《建设工程工程量清单计价规范》(GB50500-2013)的规定,关于编制
工程项目质量控制,就是在项目实施整个过程中,包括项目的()等各个阶段,项目参与
最新回复
(
0
)