首页
登录
职称英语
London’s public transport system is no longer the "sick man" but the jewel i
London’s public transport system is no longer the "sick man" but the jewel i
游客
2023-10-21
34
管理
问题
London’s public transport system is no longer the "sick man" but the jewel in the crown" of the capital’s 2012 Olympic dream, bid chiefs said last night.
Transport experts told the International Olympic Committee scrutinizing Britain’s chances that London’s railways and roads would soon be the envy of the world.
Once improvements were in place, athletes would spend time "competing not commuting", bid leader Lord Coe told the IOC panel on the first day of their visit.
The need for an overhaul came after the IOC criticised London’s " obsolete" public transport systems in a report last May.
Yesterday the London 2012 bid made a series of promises including;
£ 10 billion of investments including a £ 1 billion East London line extension, longer Jubilee line trains and Northern line upgrades.
A train serving the main Olympic Park at Stratford, East London, every 15 seconds, on ten different rail lines.
Twelve-carriage, 225kph (140mph) javelin trains using the Channel Tunnel Rail Link and taking passengers between Straford and King’s Cross in six-and-a-half minutes.
Tube trains running until 2:30 a. m. every day of the Olympics.
Connecting services which will allow visitors to reach the Olympic Park from 309 stations.
The 13-member IOC panel will today have its first taste of the Underground, with a Jubilee line trip to the Millennium Dome. They will also travel on the Channel Tunnel Rail Link, watching a video outlining the transport improvements to be delivered every year up to 2012.
But they will spend most of their time on coaches as they travel to such key sites as Wembley and Wimbledon.
Transport Minister Tony McNulty admitted there were concerns about how London would cope with 500, 000 extra visitors a day. But Transport for London said the Olympic fortnight in August would lead to only a five percent increase in passengers—when 20 percent of London’s commuters were on holiday. Questions: [br] The title of the passage probably is______.
选项
答案
Transport:“a jewel”in bid for Olympic 2012
解析
(本文主要讲伦敦申请2012年的奥运会,交通问题是一个最大的问题,因而伦敦要改变其交通状况,由过去的“sick man”改变到现在的“jewel in the crown”,所以可知本篇文章的标题是Transport:“a jewel”in bid for Olympic 2012。)
转载请注明原文地址:https://tihaiku.com/zcyy/3117346.html
相关试题推荐
Someresearchersfeelthatcertainpeoplehavenervoussystemsparticularly_____
Thissortofrudebehaviourinpublichardly________apersoninyourposition.A、
(1)IhaveanunclewhowasforyearsaChicagopublicschoolteacher.Passi
ThearchitectoftheWalkieTalkiebuildinginLondonhasadmittedthathep
My________concertwasasuccess.A、brother’slongfirstpublicB、brother’sfirst
Urbancongestionwouldbegreatlyrelievedifonlythe________chargedonpublic
London’spublictransportsystemisnolongerthe"sickman"butthejeweli
A.CasaPedroisasmall,SpanishrestaurantinNorthLondon.It’sapopular
A.CasaPedroisasmall,SpanishrestaurantinNorthLondon.It’sapopular
A.CasaPedroisasmall,SpanishrestaurantinNorthLondon.It’sapopular
随机试题
[originaltext]W:Simon,couldyoureturnthetoolsIlentyouforbuildingthe
Infact,evenwithouthumans,theEarth’sclimatechanges.Someclimatechan
[originaltext]M:Let’sgoforapicnicthisweekend.W:Ican’tI’m’afraid.M
为什么甲状腺能随吞咽动作而上、下移动?
共用题干 患者女性,31岁,行胆总管切开取石、T管引流术,目前为术后第10天,
抗战初期,正面战场几次战役接连失败的根本原因是 A.中日双方军事实力差距过大
期货市场的定量分析,一般是指运用各种分析方法特别是统计和计量方法,对( )进行
建设投资可分为静态投资部分和动态投资部分。下列属于静态投资的有()。A.建筑安
在工业生产中散发的各种粉尘、有害气体和蒸气等有毒有害物,如果不加控制,会使室内、
关于编制技术标书要求的说法,准确的有()。 技术标书的编制依据应该以技术
最新回复
(
0
)