首页
登录
职称英语
How many pre-constructed sections are made on land? [originaltext]M: Good evenin
How many pre-constructed sections are made on land? [originaltext]M: Good evenin
游客
2023-10-18
35
管理
问题
How many pre-constructed sections are made on land?
M: Good evening! And welcome to the science show. We’ve heard a lot recently about extreme engineering. And one of the most amazing and astonishing ideas is a rail tunnel under the Atlantic Ocean, linking New York and London. With me in the studio to discuss this is Professor Massa. Welcome to the program, professor.
W: Thank you.
M: So, the first question, how would the transatlantic tunnel be built?
W: Well, it will be built in pre-constructed sections.
M: Urn, pre-constructed sections?
W: Yes, they would be made on land, and then put together under the sea.
M: Oh, how many of them?
W: Fifty-four thousand. They will be held in place by giant anchors which will be fixed to the bottom of the ocean. The tunnel will float 200 meters under the surface.
M: Amazing. And now as I understand it, the train running through this tunnel would be a magnetically levitated train, is that right? So what is a magnetically levitated train?
W: A magnetically levitated train, or maglev, isn’t like a conventional train. It doesn’t have wheels and doesn’t travel on rails. It travels in the vacuum between two magnets. The idea about it is an old one invented in Germany over seventy years ago.
M: And how fast does it travel ?
W: At the moment, a maglev train can travel at about 500km per hour. However, it will be possible for it to travel at 6,000km per hour.
M: Are you serious?
W: The journey from New York to London is about 5000km, and it will take 54 minutes.
M: How is this possible?
W: Well, ordinary trains travel on rails, so they can only reach a speed of around 300km per hour, and they are also very noisy. Maglev trains don’t use rails, so there’s no noise. There’s no pollution. The train would be fast, comfortable and quiet. The disadvantage is that the tracks should be specially built and they are very expensive indeed.
M: And will the transatlantic tunnel be safe?
W: Well, safety is the big problem. The ocean is very powerful, and the tunnel could be bent or cracked. Also a passing submarine or a drifting iceberg could hit the tunnel.
选项
A、54,000.
B、45000
C、50000
答案
A
解析
采访中Professor Massa告诉主持人一共有54,000个部件。
转载请注明原文地址:https://tihaiku.com/zcyy/3109276.html
相关试题推荐
[originaltext]CarbonFootprintAca
[originaltext]SpaceJunkSpacejunk
[originaltext]M:Thatwasalovelyparty,wasn’tit?W:Yes,itwas.Thefoodw
[originaltext]M:Thatwasalovelyparty,wasn’tit?W:Yes,itwas.Thefoodw
[originaltext]M:Thatwasalovelyparty,wasn’tit?W:Yes,itwas.Thefoodw
[originaltext]M:Thatwasalovelyparty,wasn’tit?W:Yes,itwas.Thefoodw
[originaltext]W:Hi,Jay!M:Hi,Linda.AreyoureadyforyourbigtriptoChic
[originaltext]W:Hi,Jay!M:Hi,Linda.AreyoureadyforyourbigtriptoChic
[originaltext]W:Hi,Jay!M:Hi,Linda.AreyoureadyforyourbigtriptoChic
[originaltext]M:Goodmorning,Mrs.Black.Anynews?W:Goodmorning,Mr.Brown
随机试题
我国《保险法》规定,对于财产保险而言,当( )时,被保险人对保险标的不具有保险
典型胃平滑肌瘤的声像图特征是A.边缘光整的类圆形较均匀低回声肿块 B.形态不规
A.煨法B.提净法C.渗析制霜法D.水飞法E.烘焙法诃子宜采用的炮制方法是
Thechangeinthatvillagewasmiraculou
在Word中,要设置奇偶页的页眉和页脚不同,可使用()来完成设置。A.“打印”对
对于个人住房贷款的支付管理,下列说法正确的有()。A.银行可以采用贷款人受托支
根据《立法法》的规定,下列属于行政法规可以规定的事项有:()A.有关国务院组织
我国政府采购法对政府采购主体所做的界定中不包括().A:国家机关 B:事业单位
全面促进资源节约集约利用。要树立( )的资源观,用最少的资源环境代价取得最大的
下列工程项目中,可以由外商投资建筑业企业承包的有( )。2017真题A、中国投资
最新回复
(
0
)