首页
登录
职称英语
How many pre-constructed sections are made on land? [originaltext]M: Good evenin
How many pre-constructed sections are made on land? [originaltext]M: Good evenin
游客
2023-10-18
56
管理
问题
How many pre-constructed sections are made on land?
M: Good evening! And welcome to the science show. We’ve heard a lot recently about extreme engineering. And one of the most amazing and astonishing ideas is a rail tunnel under the Atlantic Ocean, linking New York and London. With me in the studio to discuss this is Professor Massa. Welcome to the program, professor.
W: Thank you.
M: So, the first question, how would the transatlantic tunnel be built?
W: Well, it will be built in pre-constructed sections.
M: Urn, pre-constructed sections?
W: Yes, they would be made on land, and then put together under the sea.
M: Oh, how many of them?
W: Fifty-four thousand. They will be held in place by giant anchors which will be fixed to the bottom of the ocean. The tunnel will float 200 meters under the surface.
M: Amazing. And now as I understand it, the train running through this tunnel would be a magnetically levitated train, is that right? So what is a magnetically levitated train?
W: A magnetically levitated train, or maglev, isn’t like a conventional train. It doesn’t have wheels and doesn’t travel on rails. It travels in the vacuum between two magnets. The idea about it is an old one invented in Germany over seventy years ago.
M: And how fast does it travel ?
W: At the moment, a maglev train can travel at about 500km per hour. However, it will be possible for it to travel at 6,000km per hour.
M: Are you serious?
W: The journey from New York to London is about 5000km, and it will take 54 minutes.
M: How is this possible?
W: Well, ordinary trains travel on rails, so they can only reach a speed of around 300km per hour, and they are also very noisy. Maglev trains don’t use rails, so there’s no noise. There’s no pollution. The train would be fast, comfortable and quiet. The disadvantage is that the tracks should be specially built and they are very expensive indeed.
M: And will the transatlantic tunnel be safe?
W: Well, safety is the big problem. The ocean is very powerful, and the tunnel could be bent or cracked. Also a passing submarine or a drifting iceberg could hit the tunnel.
选项
A、54,000.
B、45000
C、50000
答案
A
解析
采访中Professor Massa告诉主持人一共有54,000个部件。
转载请注明原文地址:https://tihaiku.com/zcyy/3109276.html
相关试题推荐
[originaltext]CarbonFootprintAca
[originaltext]SpaceJunkSpacejunk
[originaltext]M:Thatwasalovelyparty,wasn’tit?W:Yes,itwas.Thefoodw
[originaltext]M:Thatwasalovelyparty,wasn’tit?W:Yes,itwas.Thefoodw
[originaltext]M:Thatwasalovelyparty,wasn’tit?W:Yes,itwas.Thefoodw
[originaltext]M:Thatwasalovelyparty,wasn’tit?W:Yes,itwas.Thefoodw
[originaltext]W:Hi,Jay!M:Hi,Linda.AreyoureadyforyourbigtriptoChic
[originaltext]W:Hi,Jay!M:Hi,Linda.AreyoureadyforyourbigtriptoChic
[originaltext]W:Hi,Jay!M:Hi,Linda.AreyoureadyforyourbigtriptoChic
[originaltext]M:Goodmorning,Mrs.Black.Anynews?W:Goodmorning,Mr.Brown
随机试题
Withoutfanfareorlegislation,thegovernmentisorchestratingaquietrevo
[originaltext]M:YoumustbeprettyexcitedaboutyourtriptoEurope.Whenare
ClassificationofLodgingPlacesThetouristindustryhasits
建筑工程项目中建筑材料费占工程成本的80%,应合理地组织建筑材料的计划、供应与使
图书馆同一本书藏有多册,规定同一本书一个读者一次只能借一册,但同一本书允许一个读
证券公司信息公开披露制度要求所有证券公司实行()。 ①财务信息公开披露②
共用题干某品牌汽车销售商为了对该品牌汽车的销售情况做出准确判断,需要对汽车市场
班上同学的业余爱好多种多样,如游泳、武术、桥牌等等。已知:(1)班上陈祥同学和吴
甲有1辆货车,租与乙经营,租期半年,在第3个月甲将该车卖给丙,因租期未满,甲无
关于施工测量的说法,正确的是()。A.施工控制网复测属于开工准备阶段测量 B
最新回复
(
0
)