首页
登录
职称英语
High in the Mojave desert, 130 miles northeast of Los Angeles, lies a vast fi
High in the Mojave desert, 130 miles northeast of Los Angeles, lies a vast fi
游客
2023-10-14
53
管理
问题
High in the Mojave desert, 130 miles northeast of Los Angeles, lies a vast field of mirrors. Crisscrossing rows of glass and metal, glinting in the sunlight, cover a full square mile of dirt. It is a fully operational array of power plants churning out an average of 180 megawatts of electricity.
Most people think of solar power as a flat panel on every rooftop. But photovoltaic panels have limitations. They work fine when the sun is strong, but when the clouds roll in you’ d better have batteries to run the TV and dishwasher. And even on the sunniest days the panels are not very well suited for cities, where roof space is limited.
For decades, engineers have been working on ways to catch the sun over a broad area concentrating it and using it to produce electricity on the same scale as centralized coal, hydro or nuclear power plants—hundreds of megawatts at a time. Several pilot plants have been operating in California, some for decades, but so far they have not had enough volume to force costs down to competitive levels.
Some countries are expected to go with much larger plants capable of generating more than 100 megawatts each. If some of the projects are completed, costs could come down from the current 15 cents a kilowatt-hour for the Mojave plant to 8 cents per kwh in the next 8 to 10 years. That would go a long way toward closing the gap with gas and oil, which now cost as little as 4 cents per kwh.
The Mojave plant is one of the world’ s first commercial solar power plants, with five solar Electric Generating Systems (SEGS) supplying electricity to southern California. The basic component of a SEGS plant is a row of mirrors that reflect sunlight onto a pipe filled with oil. The oil heats up and is used to produce steam, which turns an electrical turbine. Assemble a few dozen rows of these trough-mirrors, and you have got capacity to generate 30 megawatts of power, enough for half a small town. The problem with trough technology is that the oil loses its heat too quickly. When the sun goes down, so does the power.
A Solar Tres design uses molten salt instead of oil. Since salt holds more heat longer than oil, it can drive turbine through the night. Concentric rings of mirrors direct sunlight to a tank of molten salt. When the stuff is hot enough, some goes straight to a generator to produce steam, while the rest is stored for use at night. The 15-megawatt Solar Tres plant would be the first long-term commercial power production project. Since the electricity is expected to be costly close to 20 cents per kwh, the Spanish government plans to subsidize the plant.
The next big thing—Dish systems—is already in the works. The building block of such a plant is a parabolic mirror, shaped like a satellite dish, that reflects sunlight onto a small generator suspended in front. The heat drives a turbine. Theoretically a dish configuration would produce more energy per acre than other solar concentrating plants, that is, if engineers could figure out a good way of linking many dishes together.
Questions 66 ~ 70
Answer the following questions with the information given in the passage. [br] Why couldn’ t we widely use solar power as flat-panel ones in cities?
选项
答案
We don’t have enough roof space.
解析
文章第二段提到,即使在阳光最充足的日子,这种面板也不太适合屋顶空间有限的城市。说明局限性体现在屋顶空间的不足。由此可知本题答案。
转载请注明原文地址:https://tihaiku.com/zcyy/3098213.html
相关试题推荐
IfyouflyovertheNazcaDesertalongthesoutherncoastofPeru,youwill
IfyouflyovertheNazcaDesertalongthesoutherncoastofPeru,youwill
IfyouflyovertheNazcaDesertalongthesoutherncoastofPeru,youwill
IntheU.S.,thelargestcityalongthePacificCoastis______.A、LosAngeles
HighintheMojavedesert,130milesnortheastofLosAngeles,liesavastfi
HighintheMojavedesert,130milesnortheastofLosAngeles,liesavastfi
HighintheMojavedesert,130milesnortheastofLosAngeles,liesavastfi
HighintheMojavedesert,130milesnortheastofLosAngeles,liesavastfi
HighintheMojavedesert,130milesnortheastofLosAngeles,liesavas
HighintheMojavedesert,130milesnortheastofLosAngeles,liesavas
随机试题
Whenonerestaurantisasgoodas______difficulttochooseafavorite.A、another
Modernintelligencetestingbeganin【B1】______.FrenchpsychologistBinetba
根据《建筑施工升降机安装、使用、拆卸安全技术规程》JGJ215-2010,严禁用
A.滋阴透热 B.辛凉透热 C.凉血清热 D.甘温除热 E.和解退热补中
对于有抗磨要求的混凝土,采用高强度等级硅酸盐水泥所拌制的混凝土,其抗压强度等级不
下列颅脑损伤最急需处理的是A.脑震荡 B.颅顶凹陷骨折超过1.5cm C.颅
等渗性腹腔积液大量输入等渗盐水可导致A.血钠过高 B.血镁过高 C.血氯过高
对于调压室,下列说法正确的是( )。A.用来调节水轮机的工作水头 B.用来反
施工现场出入口明显处应设置“五牌一图”,下列不属于“五牌一图”内容的是()。A.
窦性停搏与窦房传导阻滞的心电图鉴别诊断要点为A.窦性停搏时的长PP间期是基本窦性
最新回复
(
0
)