首页
登录
职称英语
Estimates were obtained from three contractors on the costs of covering the
Estimates were obtained from three contractors on the costs of covering the
游客
2023-09-26
73
管理
问题
Estimates were obtained from three contractors on the costs of covering the offices and class-rooms. All these three were in the $20,000 to $25,000 range. The work would take about three weeks.
Because the central unit would be installed on the roof, some noise problems might occur during a four-or five-day period. And this work could be started from this weekend, and the over-time labor costs of about $1,500 have been included in the estimates.
Additional Installation
Because a larger installation, including a more powerful central unit, would be necessary to handle the halls and stairways, an additional $6,000 would be required for the equipment. If this additional work were delayed until a later time, a new central unit would be required along with changes in the pipe way.
Subject: (46)______ Costs for East Hall
Office and Classroom Installation:
1. Covering area: seven offices and two (47)______
2. Possible problem: some (48)______ might occur during a four- or five-day period
Additional Installation:
1. Budget: $6,000
2. A more powerful (49)______ is needed to handle the halls and stairways
3. Additional installation postponement will result in changes in (50)______ [br]
选项
答案
Air-conditioning Installation
解析
转载请注明原文地址:https://tihaiku.com/zcyy/3046197.html
相关试题推荐
Estimateswereobtainedfromthreecontractorsonthecostsofcoveringthe
Estimateswereobtainedfromthreecontractorsonthecostsofcoveringthe
Estimateswereobtainedfromthreecontractorsonthecostsofcoveringthe
(see)______fromspace,ourearth,withwatercovering70%ofitssurface,appear
Biddingdocumentscanbeobtainedatthefollowingaddressuponreceiptofanon
Seenfromspace,ourearth,withwatercovering70%ofitssurface,appearsasa
FireInstructionThepersondiscoveringafire
FireInstructionThepersondiscoveringafire
FireInstructionThepersondiscoveringafire
FireInstructionThepersondiscoveringafire
随机试题
Somepeopleassociatemigrationmainlywithbirds.Birdsdotravelvastdist
PassageThree[br]WhatdoesVictoriaL.Brescoll’sstudy"CananAngryWoma
Aprojectlikelytoevolveinthenearorintermediatefutureisspacetouri
既是正确核定新增固定资产价值,反应竣工项目建设成果的文件,又是办理固定资产交付使
孕妇临产5小时,宫缩30~35秒,间隔5~6分钟,胎心140次/分钟,阴道流水,
A.6.5%~8.5% B.90%~91% C.7%~8% D.50%~7
针对该矿的安全生产管理,下列判断正确的有( )。A.安全生产管理制度更新不及时
等截面轴向拉伸杆件上1、2、3三点的单元体如图示,以上三点应力状态的关系是(
上海市政府将该市工商局的行政执法处设立为行政执法办公室,经市政府常务会议决定授权
在代理型CM模式下,CM合同价格为()A、CM费十与CM单位签订合同的各分包商、
最新回复
(
0
)