首页
登录
职称英语
[originaltext] The world’s first completely automatic railway has been built
[originaltext] The world’s first completely automatic railway has been built
游客
2023-09-12
39
管理
问题
The world’s first completely automatic railway has been built under the busy streets of London. The railway is called the Victoria Line, and it is part of the complete London underground railway.
The new Victoria Line was opened in 1969. This new line was very different from the others.
The stations on the other lines need a lot of workers to sell tickets, and to check and to collect them when people leave the trains. This is all different of the Victoria Line. Here a machine checks and collects the tickets, and there are no workers on the platforms.
On the train, there is only one worker. If necessary, this man can drive the train. But usually he just starts it; it runs and stops by itself. The trains are controlled by electrical signals which are sent by the so-called "command spots". The Command spot are the same distance apart. Each sends a certain signal. The train always moves at the speed that the command spots allow. If the command spots send no signal, the train will stop.
Most of the control work is done by computers. The computers also fix the train’s speeds, and send the signals to the command spots.
Other machines make sure that the trains are always a safe distance apart. One train may stay too long at a station, the other trains will then automatically move slower. So there is no danger of accident on the line.
选项
A、To drive the train after it is started automatically.
B、To start the train and to drive it when necessary.
C、To take care of the passengers on the train.
D、To send commanding signals to the command spot.
答案
B
解析
转载请注明原文地址:https://tihaiku.com/zcyy/3007269.html
相关试题推荐
[originaltext]W:Hi,Jack.Tomorrow’sthebigday!Youmustbeexcitedaboutg
[originaltext]W:Hi,Jack.Tomorrow’sthebigday!Youmustbeexcitedaboutg
[originaltext]W:Hi,Jack.Tomorrow’sthebigday!Youmustbeexcitedaboutg
[originaltext]Theworld’sfirstcompletelyautomaticrailwayhasbeenbuilt
[originaltext]Theworld’sfirstcompletelyautomaticrailwayhasbeenbuilt
[originaltext]M:Hey!Jenny,doyouwanttolivealongerlife?W:Why?Ofcour
[originaltext]M:Hey!Jenny,doyouwanttolivealongerlife?W:Why?Ofcour
[originaltext]M:Hey!Jenny,doyouwanttolivealongerlife?W:Why?Ofcour
[originaltext]M:Hey!Jenny,doyouwanttolivealongerlife?W:Why?Ofcour
[originaltext]M:Hello.W:Hello,Sam.ThisisPaulaHanson.Sorrytobotheryo
随机试题
[originaltext]M:Comeinandhaveaseatplease,Ann.Pleasemakeyourselfath
教师资格证面试姿态的基本原则是端正、精神焕发,给考官以清新振奋的感觉。具体而
A.直行和向左转弯 B.直行和向右转弯 C.禁止直行和向右转弯 D.只准向
甲建筑施工企业的企业资质为二级,近期内将完成一级的资质评定工作,为了能够承揽正在
A. B.AgBr和AgCl C. D.
夏季容易发生雷电灾害,下列避险措施正确的有:A、降低身体重心蹲下 B、拔掉座机
有机磷杀虫药中毒需与下列哪项疾病相鉴别A、中暑 B、急性胃肠炎 C、脑炎
据2006年人口变动抽样调查,年末浙江省常住人口为4980万人,比上年增长1.6
下列关于城市道路横断面形式选择考虑因素的表达,哪些选项是正确的?( )A.符合
某公路隧道长3000m,穿越的岩层主要由页岩和砂岩组成,设计采用新奥法施工,分部
最新回复
(
0
)