首页
登录
职称英语
[originaltext] The world’s first completely automatic railway has been built
[originaltext] The world’s first completely automatic railway has been built
游客
2023-08-27
51
管理
问题
The world’s first completely automatic railway has been built under the busy streets of London. The railway is called the Victoria Line, and it is part of the complete London underground railway. The new Victoria Line was opened in 1969. This new line was very different from the others. The stations on the other lines need a lot of workers to sell tickets, and to check and to collect them when people leave the trains. This is all different on the Victoria Line. Here a machine checks and collects the tickets, and there are no workers on the platforms. On the train, there is only one worker. If necessary, this man can drive the train. But usually he just starts it; it runs and stops by itself. The trains are controlled by electrical signals which are sent by the so-called "command spots". The command spots are the same distance apart. Each sends a certain signal. The train always moves at the speed that the command spots allow. If the command spot sends no signals, the train will stop. Most of the control work is done by computers. The computers also fix the train’s speeds, and send the signals to the command spots. Other machines make sure that the trains are always a safe distance apart. One train may stay too long at a station; the other trains will then automatically move slower. So there is no danger of accidents on the line.
22. What happened to the London underground railway over four decades ago?
23. Who checks and collects the tickets on the Victoria Line?
24. What is the task of the one worker on the Victoria Line train?
25. What will happen on the line if each train moves at its own speed?
选项
A、To drive the train after it is started automatically.
B、To start the train and to drive it when necessary.
C、To take care of the passengers on the train.
D、To send commanding signals to the command spot.
答案
B
解析
细节推断题。短文中间部分提到,在“维多利亚线”上,每列火车上只有一位工作人员,通常只负责让火车启动,虽然他可以操纵火车,但一般情况下,火车都是自动运行的。由此可知,在“维多利亚线”上,唯一的工作人员的职责是让火车启动并在需要时进行驾驶。
转载请注明原文地址:https://tihaiku.com/zcyy/2961042.html
相关试题推荐
[originaltext]Pullingheavysuitcasesalldayinthesummerishardwork,e
[originaltext]Pullingheavysuitcasesalldayinthesummerishardwork,e
[originaltext]Pullingheavysuitcasesalldayinthesummerishardwork,e
[originaltext]Nobodycaneverknowwhomadethefirstdoll.Perhapsaprehi
[originaltext]Oneofthefirstquestionsanybodyasksaboutanew-bornis"
[originaltext]M:Hi,Helen,whatdoyouthinkofourclassinchildren’slitera
[originaltext]M:Hi,Helen,whatdoyouthinkofourclassinchildren’slitera
[originaltext]W:Mr.Wang,itisreportedthatyouruniversityisthefirstone
[originaltext]W:Mr.Wang,itisreportedthatyouruniversityisthefirstone
[originaltext]W:It’samiraclethatRobertcameoutoftheaircrashalive.M:
随机试题
Afteranumberofdisagreementswiththecommittee,thechairmandecidedto_____
中性点不接地电网的单相接地故障出线较多时,为反应单相接地故障,常采用(
对于社会主义的人道主义,不正确的理解是A.护理人员应尊重病人的欲望 B.对任何
水泥砂浆在混凝土拌和物中起润滑作用。
关于个人投资者投资基金的所得税说法错误的是()。A.个人投资者买卖基金份
抗球蛋白试验可用于检测A.总补体活性B.溶血性疾病的不完全抗体C.红细胞的脆性D
A.神经性休克 B.感染性休克 C.心源性休克 D.低血容量性休克 E.
当系统发生单相接地时,应带电检查该系统上的电容器。
无效合同的法律效力()。A.自登记时无效 B.自履行时无效 C.自被确认无
控制决策的一般步骤包括()。A.确定目标 B.分析原因 C.拟定措施
最新回复
(
0
)