首页
登录
职称英语
[originaltext] In today’s throw-away society, dealing with the city’s growin
[originaltext] In today’s throw-away society, dealing with the city’s growin
游客
2023-08-22
41
管理
问题
In today’s throw-away society, dealing with the city’s growing mountain of waste is an increasing challenge for the city council.
Recently, Edinburgh is faced with the problem of disposing of about 250,000 tons of waste a year. Despite different ways to dispose of much of it in a green manner-largely through encouraging recycling-its aging facilities such as the Powderhall landfill do not have the ability to deal with it.
The European Union (EU) has issued a new policy, regulating how such mountains of waste are to be disposed of. The five councils face fines around £18 million a year from 2013 if they don’t increase recycling levels and rely less on landfill. With this in mind, the councils got together with the idea of building a large plant for burning waste to burn half of the waste produced in their districts. But this plan fell apart after the change of target levels by a new UK government waste policy.
After the plan was abandoned, a private company offered an alternative solution when it suggested opening a huge waste site near Portobello.
Since Powderhall landfill site is supposed to close in 2015, it seemed necessary for the Edinburgh Council to accept the suggestion. But soon they turned it down-after 700 local objections reached them-because it would have meant hundreds of lorries a day making loud noise through heavily populated areas.
That still leaves the council with a problem. By 2015, only 50% of 1995 levels of waste will be allowed to be sent to landfill. Even if recycling targets are met, there will still be a large amount of rubbish to be burnt up. Due to this, Edinburgh and Midlothian councils have now decided to work together to build a burning plant as time to find a solution is fast running out.
Questions 20 to 22 are based on the passage you have just heard.
20. What is the main way of handling waste in a green manner in Edinburgh?
21. What was the purpose of the five councils working out a plan to build a plant for burning waste?
22. What is the final decision of Edinburgh and Midlothian councils?
选项
A、By restoring.
B、By burying.
C、By burning.
D、By recycling.
答案
D
解析
由短文中提到Despite different ways to dispose of much of it in a green manner-largely through encouraging recycling可知,在Edinburgh用环保方式处理垃圾的最主要方法就是回收,故答案为D)。
转载请注明原文地址:https://tihaiku.com/zcyy/2947589.html
相关试题推荐
[originaltext]W:We’veallheardthesayingLaughteristhebestmedicine.How
[originaltext]W:We’veallheardthesayingLaughteristhebestmedicine.How
[originaltext]W:Abunchofusaregettingtogetherforavolleyballmatchont
[originaltext]W:Abunchofusaregettingtogetherforavolleyballmatchont
[originaltext]W:Abunchofusaregettingtogetherforavolleyballmatchont
[originaltext]W:Abunchofusaregettingtogetherforavolleyballmatchont
[originaltext]W:Abunchofusaregettingtogetherforavolleyballmatchont
[originaltext]W:Abunchofusaregettingtogetherforavolleyballmatchont
[originaltext]Mr.Stevensonwastheownerofageneralappliancestore.He
[originaltext]Americanslearnsportsaspartoftheireducation.Theylearn
随机试题
[originaltext]M:Ineedanencyclopediatofindoutsomething.CanIlookatma
TheAmericaneconomicsystemisorganizedaroundabasicallyprivate【B1】_____
TheConceptofStyleStylemaybedefinedasthecharact
"Thetoyindustryhasalwaysreflectedadultculture,"saysChrisByrne,an
审稿题:审读短稿,按审稿的基本要求指出其中存在的错误或缺漏。(本题20分)
下列千兆以太网标准中,传输距离最短的是( )。A.1000BASE-FX B
地下连续墙中导墙的作用有( )。A.提高墙体的刚度 B.加固槽口 C.确保
A第一组图的规律为:三个图形只有一个图形出现两边露头的交叉,排除C项,只有一个图形三条线段交于一点,除去两边露头的交叉图形外,另两个图形除去构成较大角的那两条线
某养老院的服务对象老王最近常常失眠,还总是怀疑自己的东西被别人偷走了,过几天又说
Excel2007(或Excel2013)中,图表制作完成后,其图表类型可以随意
最新回复
(
0
)