首页
登录
职称英语
[originaltext]W: So how’s our presentation about the restructuring of the compa
[originaltext]W: So how’s our presentation about the restructuring of the compa
游客
2023-08-08
68
管理
问题
W: So how’s our presentation about the restructuring of the company coming along?
M: Fine. I’m putting the finishing touches to it now, but we’ll have to be prepared for questions.
W: Yes, there is already a feeling that this is a top-down change. We really need to get everyone on board.
M: Well, there’s been an extensive consultation period.
W: I know, but there’s always the feeling that if it isn’t broke, don’t fix it.
M: People are worried about their jobs, too. I think we need to stress that while there will be some job changes, there won’t be anyone getting dismissed. In fact, we’re looking to take on more staff.
W: Agreed. You can hardly blame people for worrying though. We need to make it clear that it’s not just change for change’s sake. In other words, we really must make the case for why we’re doing it. So what’s the outline of the presentation?
M: I’ll start with a brief review of the reasons for the change that we really need to make a clean break to restart growth. After that, I’ll outline the new company structures and who’s going where. Then I’ll hand it over to you to discuss the timeline and summarize. And we’ll take questions together at the end. Anything else?
W: Oh, yeah. We should let the staff know the channels of communication, you know, who they can contact or direct questions to about these changes.
M: Yes. And we can collect some frequently asked questions and present some general answers.
W: Mm, and we’ll make the presentation and the questions available via the company’s own computer network, right?
M: Yes. We’ll make a page on the network where staff can download all the details.
W: All right. Perhaps we should do a practice run of the presentation first.
M: You bet.
Questions 5 to 8 are based on the conversation you have just heard.
5. What is the man going to do?
6. What does the man say about the restructuring?
7. What will the man explain first?
8. How can the staff learn more about the company’s restructuring?
选项
A、It will cut production costs.
B、It will raise productivity.
C、No staff will be dismissed.
D、No new staff will be hired.
答案
C
解析
对话中男士说,他认为需要强调的是,虽然会有一些工作变动,但不会有人被辞退。因此答案为C)。
转载请注明原文地址:https://tihaiku.com/zcyy/2909178.html
相关试题推荐
代表bearepresentationof
典型代表atypicalrepresentation
[originaltext]Objectsthatarevibratingmakesounds.Rhythmicsoundvibrations
[originaltext]Inorderforachemicaltobeconsideredadrug,itmusthavethe
[originaltext]Inorderforachemicaltobeconsideredadrug,itmusthavethe
[originaltext]Hi,everybody.AsIsaidinmyStateoftheUnionaddress,weliv
[originaltext]Hi,everybody.AsIsaidinmyStateoftheUnionaddress,weliv
[originaltext]Easterisamixofthreetraditions:Pagan,HebrewandChristian.
[originaltext]Easterisamixofthreetraditions:Pagan,HebrewandChristian.
[originaltext]Easterisamixofthreetraditions:Pagan,HebrewandChristian.
随机试题
[originaltext]M:Hello,WilliamSmith’sspeaking,whatcanIdoforyou?W:Hel
UKNewspapersI.Introduction—manynationalnewspapers—nonational【T1】______
建设单位在工程竣工验收合格之日起15日内未办理工程竣工验收备案的,备案机关责令限
已知某公司当前资金结构如下: 因生产发展,公司年初准备增加资金2500万元
2020年1-10月,我国规模以上互联网和相关服务企业(简称互联网企业)完成业务
在依法收贷中,债务人应当自收到支付令之日起()日内向债权人清偿债务,或者向人民
昆布与海藻均有的功效是A.消痰软坚、清心定惊 B.消痰软坚,利水消肿 C.消
在工程建设设计进度控制计划体系中,需要考虑设计分析和评审的工作时间安排的进度计划
A. B. C. D.
下列施工作业内容中,需要编制施工方案的有()。2017A.大型设备吊装 B.支
最新回复
(
0
)