首页
登录
职称英语
[originaltext] Are you ready to unlock your productivity potential? Have you
[originaltext] Are you ready to unlock your productivity potential? Have you
游客
2023-08-07
34
管理
问题
Are you ready to unlock your productivity potential? Have you accomplished the resolutions you made at the beginning of the year? If you haven’t, don’t worry. (16)Here are some tips on how to make your day the most productive.
(17)The first thing you need to keep in mind is that you are in control of your life.
Time flies, and sometimes it flies so fast without you realizing it. What you need to remember is that everything in your life is dictated by the choices you make. So, begin each day by reminding yourself that you are in control and you decide what happens today.
Only you can decide whether or not it is going to be a productive day.
Start your day with a positive mind. Not all tasks that you have listed are easy. This may include talking to your boss about a raise, tackling a complicated project—or even just going to the gym. You may start thinking that your boss will say "No" or about all the obstacles you are going to face on the project. You might think going to the gym is too tiring and better not do it.
Abraham Lincoln said, "We can complain because rose bushes have thorns, or rejoice because thorn bushes have roses."
We just have to look at things differently. Perhaps your boss will consider that you have made valuable contributions to the team and agree that your request for a raise is justified. Look at a complicated project as a challenge that will help you learn something. Think of the benefits going to gym will give you. Learn to be optimistic and good things will follow. (18)On the other hand, if things didn’t go as expected, then always remember: When one door closes, another will open. The lost opportunity may not be for you but you are up for something much better.
It is all about having the proper mindset. Be positive.
(19)As human beings, we think that we have all the time in the world to do the things we want and need to do. This is the reason we tend to waste time. We are always thinking that we have tomorrow to spare and we can just push to do things to another day. But what if you don’t have tomorrow?
Today is something to be thankful for, so better spend it wisely. You’ll never know what is going to happen tomorrow. Do the things that you have set today right at this moment.
Say "No" to procrastination and always say "Yes" to today.
Questions 16 to 19 are based on the recording you have just heard.
16. What is the talk mainly about?
17. What is the first thing to keep in mind according to the speaker?
18. What should we do if something didn’t go as expected?
19. Why do people tend to waste time?
选项
A、We should be hardworking.
B、We are in control of our life.
C、We have great potential for everything.
D、We can accomplish the resolutions.
答案
B
解析
转载请注明原文地址:https://tihaiku.com/zcyy/2905442.html
相关试题推荐
[originaltext]Objectsthatarevibratingmakesounds.Rhythmicsoundvibrations
[originaltext]Inorderforachemicaltobeconsideredadrug,itmusthavethe
[originaltext]Hi,everybody.AsIsaidinmyStateoftheUnionaddress,weliv
[originaltext]Hi,everybody.AsIsaidinmyStateoftheUnionaddress,weliv
[originaltext]IntheUnitedStates,manypeopleoncelivedinlarge,two-and-th
[originaltext]IntheUnitedStates,manypeopleoncelivedinlarge,two-and-th
[originaltext]Easterisamixofthreetraditions:Pagan,HebrewandChristian.
[originaltext]Easterisamixofthreetraditions:Pagan,HebrewandChristian.
[originaltext]Easterisamixofthreetraditions:Pagan,HebrewandChristian.
[originaltext]W:2millionhighschoolseniorsaregearingupthisfalltoappl
随机试题
Humoristhemosteffectivemeansofhandlingthedifficultsituations.Itc
Hehasa(prefer)______forvegetablesandfruit.preference此空格在不定冠词a和介词for之间,由此确定
It’sanannualargument.Doweordowenotgoonholiday?Mypartnersaysn
1Owingtothewidespreadexpansionofcasinos,thecostofpathological
如果客户可以通过电子形式询价,那么,为公司数据维持充分安全性的额最佳方式是:A.
如果地下导线分施工导线、基本导线和主要导线三级布设,地下导线测量误差对横向贯通误
各种运输方式内外部的各个方面的构成和联系,就是( )。 A.运输系统
《中华人民共和国教师法》适用于( )A.各级各类学校的管理 B.中小学学
冠心病的确诊手段是A.胸部X线 B.常规心电图 C.超声心动图 D.动态心
某分项工程计划工程量3000立方米,计划成本15元立方米,实际完成工程量2500
最新回复
(
0
)