首页
登录
职称英语
With the prospect of coal and petroleum supplies being depleted and with air
With the prospect of coal and petroleum supplies being depleted and with air
游客
2023-07-29
40
管理
问题
With the prospect of coal and petroleum supplies being depleted and with air pollution becoming an increasing concern, the major countries of the world are seeking alternate sources of energy. If a means to 【S1】______ energy from water, especially from the ocean, can be effected economically, it would furnish a never-ending supply of energy, since 70% of the earth’s surface is ocean and 【S2】______ 10% is fresh water in rivers and lakes.
From the beginning of time man has used water power as a source of work from energy-waterfalls and dams, but these are fresh water sources and are landlocked. The seas have contributed 【S3】______ or nothing in the way of power.
Ocean water is heated by the sun near the equator and drawn by the rotation of the earth toward the poles, where it cools and drops toward the ocean floor and starts its 【S4】______ back toward the equator. The differential between the two currents is 35 degrees to 45 degrees Fahrenheit and to use it the scientists must find the places where they run near land and are not too far away from each other. One area that 【S5】______ these requirements is the Caribbean sea.
One plan would somewhat resemble the operation of a refrigerator on a vast scale. 【S6】______ water would be the heat source, cold water the heat sink. A component such as Freon would be liquid at a cold temperature and 【S7】______ to gas as it warmed. Oceans also offer wave power, tides, and the chemical propensities of salt water as potential sources of energy. All these uses are 【S8】______ possible.
The British are working on a method that the Japanese have already put into 【S9】______ use on a small scale for powering their navigational buoys. Wave movement produces air under 【S10】______ that has only one escape route to a turbine that powers a generator.
A) theoretically B) turn C) meets D) needs
E) differently F) warm G) cold H) journey
I) identifies J) practical K) critical L) obtain
M) little N) another O) pressure [br] 【S5】
选项
答案
C
解析
转载请注明原文地址:https://tihaiku.com/zcyy/2880040.html
相关试题推荐
Frombankerstofactorystaff,employeesintheWestfacethebleakprospectof
Withtheprospectofcoalandpetroleumsuppliesbeingdepletedandwithair
Withtheprospectofcoalandpetroleumsuppliesbeingdepletedandwithair
Withtheprospectofcoalandpetroleumsuppliesbeingdepletedandwithair
Withtheprospectofcoalandpetroleumsuppliesbeingdepletedandwithair
Withtheprospectofcoalandpetroleumsuppliesbeingdepletedandwithair
Withtheprospectofcoalandpetroleumsuppliesbeingdepletedandwithair
ProspectingtheLocalOilMarketAsapartofitsWTO
ProspectingtheLocalOilMarketAsapartofitsWTO
ProspectingtheLocalOilMarketAsapartofitsWTO
随机试题
Whatdoesthemanmeanwhenhesaidthathedidn’twinaNobelPrize?[br][ori
Whensomeonecommitsacriminalact,wealwayshopethepunishmentwillmatc
西方现代舞始于19世纪70年代至20世纪初叶,是一种在欧美兴起的舞蹈流派。(
门静脉高压症非手术治疗的基本措施中,不包括A.病因治疗、休息、饮食及支持疗法
在篮球比赛中,掷界外球时,当裁判递交球后,掷界外球员必须在几秒内将球掷入场内,否
A.轻度心悸 B.困倦或兴奋 C.胃部不适感 D.鼻与喉咙干 E.轻度液
( )是指商业银行在不影响日常经营或财务状况的情况下,能够以合理成本及时获得充
M厂是一个大型国有拖拉机制造厂,分工较为精细,规章制度完善,程序规范。在2000
技术标书的编制依据应该以()为标准。A.施工图纸 B.技术规范 C.技术评
应实施监测的基坑工程有()A.基坑设计安全等级为一、二级的基坑 B.开挖
最新回复
(
0
)