首页
登录
职称英语
Within fifteen years Britain and other nations should be well on with the bu
Within fifteen years Britain and other nations should be well on with the bu
游客
2023-07-28
78
管理
问题
Within fifteen years Britain and other nations should be well on with the building of huge industrial complexes for the recycling of waste. The word rubbish could lose its meaning because everything which goes into the dustbin would be made into something useful. Even the most dangerous and unpleasant wasteswould provide energy if nothing else.
The new concept of recycling waste is taking shape at the British Technological Laboratory at Warren Spring, not far from the north of London. Today, the laboratory spends four times as much money in studying recycling as it did five years ago.
The latest project is to take a city of around half a million inhabitants and discover exactly what raw materials go into it and what go out. The aim is to find out how much of these raw materials could be provided if a plant for recycling waste were built just outside the city. This plant would recycle not only metal such as steel, lead and copper, but also paper and rubber as well. Methods have been discovered, for example, for removing the ink from newsprint so that the paper can be used again, and for obtaining valuable oils and gases from old motor car types. All these ideas are already being made use of, but what is new is the idea of combining them on such a large scale in a single plant designed to recycle most types of waste.
Another new project is being set up to discover the best ways of sorting and separating the rubbish. When this project is complete, the rubbish will be processed like this: First, it will pass through sharp metal spikes which will tear open the plastic bags in which rubbish is usually packed; then it will pass through a powerful fan to separate the lightest elements from the heavy solids; after that crushers and rollers will break up everything that can be broken finally, and the rubbish will pass under magnets, which will remove the bits of iron and steel; finely the rubber and plastic will then be sorted out in the final stage.
The first full-scale giant recycling plants are, perhaps, fifteen years away. But in some big industrial areas, where rubbish has been dumped for so long that there are no holes left to fill up with rubbish, these new automatic recycling plants may be built sooner. Indeed, with the growing cost of transporting rubbish to more distant dumps, some big cities will be forced to build their own recycling plants before long. [br] According to the passage, the first full-scale huge recycling plants______.
选项
A、have already been built in large industrial areas
B、will not be built for at least fifteen years
C、will probably be built in the next fifteen years
D、will be too expensive to build near big cities
答案
B
解析
语义理解题。在文章第五段最后一句“The first full-scale giant recycling plants are, perhaps,fifteen years away.”中“fifteen years away”指的是15年以后,此外通过上下文也可知第一句中所提到的full-scale giant recycling plants还没有建成。因此,正确答案是B项。
转载请注明原文地址:https://tihaiku.com/zcyy/2875990.html
相关试题推荐
WhowontheWorldCup1994footballgame?WhathappenedattheUnitedNations?H
WhowontheWorldCup1994footballgame?WhathappenedattheUnitedNations?H
WhowontheWorldCup1994footballgame?WhathappenedattheUnitedNations?H
WhowontheWorldCup1994footballgame?WhathappenedattheUnitedNations?H
WhowontheWorldCup1994footballgame?WhathappenedattheUnitedNations?H
WhowontheWorldCup1994footballgame?WhathappenedattheUnitedNations?H
WhowontheWorldCup1994footballgame?WhathappenedattheUnitedNations?H
WhowontheWorldCup1994footballgame?WhathappenedattheUnitedNations?H
WhowontheWorldCup1994footballgame?WhathappenedattheUnitedNations?H
WhowontheWorldCup1994footballgame?WhathappenedattheUnitedNations?H
随机试题
Manystudentsfindtheexperienceofattendinguniversitylecturestobeac
有关剪贴板的叙述,正确的是()。A.剪贴板上可放文本或图形 B.剪贴板上的
根据现行国家标准《平板玻璃》GB11614的规定,平板玻璃按其公称厚度可以分为(
运用收获现值法评估模型计算用材林资产价值时,需要考虑的要素有()。A.评估基准
初产妇,孕40周,妊娠晚期有细菌性阴道病病史,现规律宫缩16小时后自然分娩。产后
属于O/W型固体微粒类乳化剂的是A.阿拉伯胶 B.十二烷基硫酸钠 C.氢氧化
一住店客人未付房钱即想离开旅馆去车站。旅馆服务员揪住他不让走,并打报警电话。客人
经肝或相当药量经肝清除,肝功能减退时其清除或代谢物形成减少,可致明显毒性反应的药
暂列金额是指招标人在工程量清单中暂列并包括在合同价款中的款项,在工程量清单中应列
股份有限公司以超过股票票面金额的发行价格发行股份所得的溢价款,应当列为公司的盈余
最新回复
(
0
)