首页
登录
职称英语
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
游客
2023-07-18
36
管理
问题
The most pressing nuclear energy issue is the disposal of nuclear waste. Even if all the reactors in existence were completely safe to operate, there would still be unsolved issue of what to do with the waste from generating electricity by means of nuclear energy. Those who claim that they feel comfortable with nuclear energy are, none the less, concerned about waste disposal methods. Seven states, including California, have put the building of nuclear plants on hold until legislators are convinced that there is a safe way to dispose of the radioactive waste from the plants.
In the meantime, pools of liquid waste and piles of solid waste from private industry and governmental bomb production grow. Since 1962, the volume of radioactive waste produced by the nuclear power industry has amounted to about 4,300 cubic meters. By the end of the twentieth century, if production continues at the same rate, there will be 40,000 cubic meters of nuclear waste.
Power plants and bomb-making are not the only sources of waste. Uranium mining and milling operations have dumped 24 million metric tons of radioactive tailing wastes at dumping sites around the nation. At places where uranium is currently milled, there is another 100 million metric tons of tailings. Uranium tailings are solid materials in the slurry (or watery mixture) of depleted ore-bearing rock, chemicals, and liquids that result from milling. Usually, the slurry is piped to holding ponds. When a uranium mill goes out of business, the ponds are left to evaporate, uncovering piles of dried tailings. Uncovered piles of tailings give off radioactive radon gas. Once in the air, the gas finds its way into the water supply and the food chain. Consequently, many nuclear experts agree that uranium mill tailings may be more dangerous than high-level radioactive wastes from reactors and bombs. [br] According to the passage, all of the following are sources of radioactive waste EXCEPT ______.
选项
A、bomb production
B、nuclear fusion experiments
C、nuclear power plant operation
D、uranium mining operations
答案
B
解析
第三段的开头提到了废料的来源有Power plants and bomb-making,另外还有Uranium mining and milling operations,显然没有提到B项的内容。该题属于细节辨析题。
转载请注明原文地址:https://tihaiku.com/zcyy/2847884.html
相关试题推荐
ThelargeAmericanenergyservicecompany,Enron,failedafewyearsago.It
ThelargeAmericanenergyservicecompany,Enron,failedafewyearsago.It
[originaltext]M:Ihaveneverheardsuchafascinatinglectureonsolarenergy.
Ifwegoonconsumingenergysowastefully,______areouroilwellswillbedri
Letushopethat______anuclearwar,thehumanracemightstillsurvive.A、int
______thefirsttousenuclearweapons.A、AtnotimeChinawillbeB、NeverChina
Manyareawareofthetremendouswasteofenergyinourenvironment,butfai
Manyareawareofthetremendouswasteofenergyinourenvironment,butfai
Manyareawareofthetremendouswasteofenergyinourenvironment,butfai
Nuclearscienceshouldbedeveloped______(有益于人民而不是伤害他们).tobenefitthepeoplera
随机试题
COSTANDBENEFITSOFSOCIALLIFE(1)
[img]2019m9x/ct_eyyjsbm_eyyjsbreada_0059_201909[/img]Thefirstthingpeople
[originaltext]W:ElizabethMartinspeaking.M:Dr.Martin,mynameisMarkJohn
室外消火栓系统主要是通过室外消火栓为消防车等消防设备提供消防用水,或通过进户管为
A.合理处方B.不适宜处方C.超常处方D.不规范处方E.正确处方无适应证用药的是
寒邪的致病特点是A.易凝滞气血 B.易伤阳气 C.易致经脉挛急 D.易致腠
黄山公司委托甲、乙、丙三人共同研发,耗时6个月,三人终于共同完成了该项发明。下列
根据《国务院关于酸雨控制区和二氧化硫污染控制区有关问题的批复》相关规定,新建、改
拌合设备生产能力主要取决的因素不包括()。A.混凝土浇筑强度 B.设备容量
男孩,6岁。突发寒战,高热,1天后全身出现多处紫斑。查体:血压70/50mmHg
最新回复
(
0
)