首页
登录
职称英语
In his first term, Mayor Michael Bloomberg mapped out a fair plan to get rid
In his first term, Mayor Michael Bloomberg mapped out a fair plan to get rid
游客
2023-07-09
50
管理
问题
In his first term, Mayor Michael Bloomberg mapped out a fair plan to get rid of 11,000 tons of New York City garbage every day. The complex proposal was designed to make each district take care of its own trash. It was also supposed to help limit noisy garbage trucks going long distances through the city to reach marine barges(驳船), railways or out-of-state trash facilities.
Nobody wanted these new garbage transfer stations in their neighborhood, even with promises of new high-tech, low-smell facilities. There are already stations in Brooklyn, Queens, the Bronx and Staten Island, most of them in lower-income communities. Only one area of the city—the Upper East Side of Manhattan—has refused to accept a trash facility. The city should not give in to local resistance.
It is time for residents in that neighborhood to accept a share of the city’s garbage problem. The city should build a modern, environmentally sound facility at 91st Street to transfer trash from Manhattan to barges on the East River. That trash, estimated at up to 1,800 tons a day, would then go by barge to other states.
Deputy Mayor Cas Holloway said last week that the city has had to fight off "lawsuit after lawsuit" with "every useless argument under the sun" from those opposing the 91st Street facility. Those delays have helped push the cost for building the station from $ 125 million in 2006 to about $ 226 million now.
An earlier trash station at that site, which was closed in 1999, was badly designed so that trucks idled along York Avenue. The new facility, Mr. Holloway said, has been designed to reduce the congestion problem with longer ramps(匝道)leading to the facility, which sits on the eastern side of Franklin D. Roosevelt Drive. The plans also call for higher noise-blocking walls along the ramps.
This terminal is an essential part of the city’s 20-year waste management plan. John Doherty, the sanitation(环境卫生)commissioner, told critics at a hearing last week, " We will not entertain any changes to what is a fair and thoughtful, district-based approach that was founded on the principles of environmental equity for all New Yorkers. "
Environmental equity, in this case, means that the Upper East Side of Manhattan has to do its part. [br] What do we learn about the trash facility built at 91st Street?
选项
A、It will generate no influence on the neighborhood.
B、It will help the neighborhood deal with trash by itself.
C、It will deal with about 1,800 tons of trash a day.
D、It will be built by the side of the East River.
答案
C
解析
事实细节题。本题考查建在91号街区的垃圾站的作用。由原文可知,纽约市应该在91号街区建立一个现代化的、低噪音的处理厂把曼哈顿的垃圾转移到东河的驳船上,然后每天就能把1 800吨垃圾通过驳船运输到其他州了,故C)“它每天能处理1 800吨垃圾”为本题答案。A)“它对附近的居民不会产生影响”和原文不符,原文只提出这个垃圾站噪音低,但不意味着不会产生任何影响,该说法过于绝对,故排除;B)“它将帮助附近的居民自己处理垃圾”和原文不符,由原文可知该垃圾站会把垃圾转运到东河的驳船上运出去,而不是自行解决这些垃圾,故排除;D)“它将会被建在东河岸边”和原文不符,垃圾会被运送到东河,而不是把垃圾站建在东河岸边,故排除。
转载请注明原文地址:https://tihaiku.com/zcyy/2821630.html
相关试题推荐
[originaltext]W:Hi,Michael,youdon’tlooksogood.Anythingwrong?M:I’mO
[originaltext]W:Hi,Michael,youdon’tlooksogood.Anythingwrong?M:I’mO
[originaltext]W:Hi,Michael,youdon’tlooksogood.Anythingwrong?M:I’mO
[originaltext]W:Hi,Michael,youdon’tlooksogood.Anythingwrong?M:I’mO
[originaltext]W:Hi,Michael,youdon’tlooksogood.Anythingwrong?M:I’mO
[originaltext]W:Hi,Michael,youdon’tlooksogood.Anythingwrong?M:I’mO
[originaltext]W:Hi,Michael,youdon’tlooksogood.Anythingwrong?M:I’mO
[originaltext]W:Hi,Michael,youdon’tlooksogood.Anythingwrong?M:I’mO
Inhisfirstterm,MayorMichaelBloombergmappedoutafairplantogetrid
Inhisfirstterm,MayorMichaelBloombergmappedoutafairplantogetrid
随机试题
WhenisAnneavailableforthemeeting?[br][originaltext]M:IsthatAnneShaw
Atsometimeinyourlifeyoumayhaveastrongdesiretodosomethingstran
慢性消化性溃疡最好发的部位是()A.十二指肠下段 B.胃贲门部 C.
A.产后3~4天 B.产后7天 C.产后10天 D.产后21天 E.产后
湘君、国风和兼葭是符合伦理规范的一个和谐家庭的三个成员。他们三人中,有湘君的父亲
货物招标文件应明确投标人对招标文件的异议,投标人对招标文件提出异议的,应当在截止
(2016年真题)某女,50岁,体胖,患高血压病,证属脾虚湿盛、痰浊内阻,如蒙如
某公司拟进行股票投资,计划购买A、B、C三种股票,并分别设计了甲、乙两种资产组合
蛋白质合成和贮存必需的激素是A.氢化可的松 B.胰高血糖素 C.醛固酮 D
项目建设完工后,施工企业已经提交竣工验收报告,但建设单位未按预期组织竣工验收,当
最新回复
(
0
)