首页
登录
职称英语
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
游客
2023-07-06
53
管理
问题
The most pressing nuclear energy issue is the disposal of nuclear waste. Even if all the reactors in existence were completely safe to operate, there would still be unsolved issue of what to do with the waste from generating electricity by means of nuclear energy. Those who claim that they feel comfortable with nuclear energy are, none the less, concerned about waste disposal methods. Seven states, including California, have put the building of nuclear plants on hold until legislators are convinced that there is a safe way to dispose of the radioactive waste from the plants.
In the meantime, pools of liquid waste and piles of solid waste from private industry and governmental bomb production grow. Since 1962, the volume of radioactive waste produced by the nuclear power industry has amounted to about 4,300 cubic meters. By the end of the twentieth century, if production continues at the same rate, there will be 40,000 cubic meters of nuclear waste.
Power plants and bomb-making are not the only sources of waste. Uranium mining and milling operations have dumped 24 million metric tons of radioactive tailing wastes at dumping sites around the nation. At places where uranium is currently milled, there is another 100 million metric tons of tailings. Uranium tailings are solid materials in the slurry(or watery mixture)of depleted ore-bearing rock, chemicals, and liquids that result from milling. Usually, the slurry is piped to holding ponds. When a uranium mill goes out of business, the ponds are left to
evaporate
, uncovering piles of dried tailings. Uncovered piles of tailings give off radioactive radon gas. Once in the air, the gas finds its way into the water supply and the food chain. Consequently, many nuclear experts agree that uranium mill tailings may be more dangerous than high-level radioactive wastes from reactors and bombs. [br] According to the passage, all of the following are sources of radioactive waste EXCEPT______.
选项
A、bomb production
B、nuclear fusion experiments
C、nuclear power plant operation
D、uranium mining operations
答案
B
解析
细节题。作者在第三段提到核废料的来源有:Powerplants andbomb—making are notthe only sources ofwaste.Uranium mining and milling operations…显然没有提到B选项的内容,故选B。
转载请注明原文地址:https://tihaiku.com/zcyy/2813188.html
相关试题推荐
Bynow,everyoneknowsyousaveenergybyturningoutlights.Andyou【S1】___
Bynow,everyoneknowsyousaveenergybyturningoutlights.Andyou【S1】___
Bynow,everyoneknowsyousaveenergybyturningoutlights.Andyou【S1】___
Bynow,everyoneknowsyousaveenergybyturningoutlights.Andyou【S1】___
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
[originaltext]M:(12)TheEnergyMinisterannouncedyesterdaytheconstructionof
[originaltext]M:(12)TheEnergyMinisterannouncedyesterdaytheconstructionof
[originaltext]M:(12)TheEnergyMinisterannouncedyesterdaytheconstructionof
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
随机试题
Ithasalreadybeennotedthatalearnerneedstore-encounteranewitem
TheTruthabouttheEnvironmentA)Formanyenvironmentalists
[originaltext]M:Speakingofthesubjectoftoday,(12)whatchangeshaveyousee
从事互联网出版活动,必须( )。A.取得《网络出版服务许可证》 B.获得外资
楼梯休息平台标高为()。 A.-2.550 B.-2.400
灯具接地(PE)或接零(PEN)支线应串联连接。
关于黏膜体液免疫应答正确的是A.是以IgG抗体合成占优势为其特征 B.对于维持
某全预应力混凝土桥梁静载试验,采用电阻应变片和静态应变仪检测结构应变,试完成下述
在正常使用网络的前提下,可以有效防止黑客入侵的做法是( )。A.拔掉网线
颅脑手术后体位护理正确的是A.全麻未清醒的患者,取平卧位,以利于呼吸道护理 B
最新回复
(
0
)