首页
登录
职称英语
Boiler rooms are often dirty and steamy, but this one is pristine(干净的)and co
Boiler rooms are often dirty and steamy, but this one is pristine(干净的)and co
游客
2023-07-03
29
管理
问题
Boiler rooms are often dirty and steamy, but this one is pristine(干净的)and cool. Fox Point is a spanking new 47-unit【C1】______building in the South Bronx, one of the city’s poorest pockets. Two-thirds of its residents are formerly homeless people, whose【C2】______is paid by the federal Department of Housing and Urban Development. The【C3】______are low-income families. The boiler room houses a microturbine(微型燃气轮机)system, which【C4】______energy for electricity and heat. It reuses heat that would otherwise be lost to the atmosphere, reducing carbon【C5】______while also cutting costs.
Fox Point is operated by Palladia, a non-profit group that specialises in providing housing and services to【C6】______people. Palladia received financial support and technical expertise from Enterprise Community Partners, which helps build affordable housing by -【C7】______finance to community and housing developers.
Enterprise believes "green" and "affordable" are one and the same. It has created a national framework for healthy, efficient,【C8】______clever and affordable homes which it calls the Green Communities Criteria. These criteria include water conservation, energy efficiency and the use of green building materials. The criteria are aligned with LEED, a green rating system. Meeting the criteria【C9】______housing construction costs by 2%, which is rapidly paid back by【C10】______running costs. Even the positioning of a window to optimize daylight can help save energy. These sound ideas are spreading.
A)absorption F)gain K)providing
B)economically G)generates Drent
C)emissions H)increases M)residential
D)environmentally I)lower N)rest
E)financial J)needy O)upper [br] 【C7】
选项
答案
K
解析
动词辨析题。分析句子结构可知,空格在介词by之后和名词finance之前,finance后又有介词to,空格应填入现在分词,构成“v.-ing+sth.to sb.”结构。文章上半句提到,Palladia从社区伙伴组织那里得到财政支持,所以应该是由社区伙伴组织提供资金建房,故应填入providing“提供”。
转载请注明原文地址:https://tihaiku.com/zcyy/2805595.html
相关试题推荐
Boilerroomsareoftendirtyandsteamy,butthisoneispristine(干净的)andco
Boilerroomsareoftendirtyandsteamy,butthisoneispristine(干净的)andco
Boilerroomsareoftendirtyandsteamy,butthisoneispristine(干净的)andco
Boilerroomsareoftendirtyandsteamy,butthisoneispristine(干净的)andco
Boilerroomsareoftendirtyandsteamy,butthisoneispristine(干净的)andco
Boilerroomsareoftendirtyandsteamy,butthisoneispristine(干净的)andco
Boilerroomsareoftendirtyandsteamy,butthisoneispristine(干净的)andco
Boilerroomsareoftendirtyandsteamy,butthisoneispristine(干净的)andco
Boilerroomsareoftendirtyandsteamy,butthisoneispristine(干净的)andco
Boilerroomsareoftendirtyandsteamy,butthisoneispristine(干净的)andco
随机试题
Oscar,officiallynamedtheAcademyAwardofMerit,isthechildoftheAcad
-幢五层办公楼,顶层是大开间会议室,层高3.6m,应优先选用()。A.砌体结
阅读以下说明,回答下列问题。 [说明]现代软件的飞速发展,使得系统对软件的依赖
药物中毒,其发病类型多为A.徐发 B.复发 C.感邪即发 D.伏而后发
在感染过程中最常见的是A.健康携带者 B.潜伏期携带者 C.慢性携带者 D
肺泡内氧气与血红蛋白结合最重要的影响因素是A.血红蛋白的氧结合力 B.肺泡内氧
混凝土坝裂缝处理的目的是( )。A.保证刚度 B.保证抗渗性 C.提高混凝
解体的大型减速机安装时,一次灌浆应在()进行。A.底座就位后 B.底座粗
无损检测技术要点不包括( )。 A.圆筒形钢制储罐壁钢板焊接完毕后至少经过
(2018年真题)建设工程施工成本考核的主要指标有( )。A.竣工工程实际成本
最新回复
(
0
)