首页
登录
职称英语
Piles of dung can't be relied upon when
Piles of dung can't be relied upon when
考试题库
2022-08-02
33
问题
Piles of dung can't be relied upon when it comes to estimating elephant numbers becauseA they are different in size.B they scatter all over the region.C they are different in decay rate.D they are different in quality.
选项
A they are different in size.
B they scatter all over the region.
C they are different in decay rate.
D they are different in quality.
答案
C
解析
转载请注明原文地址:https://tihaiku.com/zcyy/1501470.html
本试题收录于:
综合A题库综合类分类
综合A
综合类
相关试题推荐
Shecanbereliedoninacrisis.A:looke
Shecanbereliedoninacrisis.A:depen
Pilesofdungcan'tberelieduponwhen
Shehasprovedthatshecanbereliedon
Theyreliedontheadviceoftheirprofe
Shecanbereliedoninacrisis.A:looke
Obviouslythesepeoplecanbereliedon
Shecanbereliedoninacrisis.A:depen
随机试题
A------railwayB------railtrackC------railwaysystemD------expresstrainE---
J2EE平台采用了多层分布式应用程序模型,实现不同逻辑功能的应用程序被封装到不
信息收集的方法包括()A.记录法 B.访谈法 C.查阅法 D.实地观察法
下列关于限额设计的说法,不正确的选项是( )。A.限额设计有利于强化设计人员的
下列关于现场调查工作受限及其处理的说法中,错误的是( )。A.现场调查受限的原因
下列情形中,可以担任公司的董事、监事、高级管理人员的有()A.限制民事行
SF6断路器交直流接触器无法励磁,造成操动机构无法正常工作属于(____)。(A
如果行为人认识到危害结果必然发生,则不可能成立( )。 A.直接故意犯罪
关于儿童多动综合症,下列说法不正确的是()。A.儿童多动症的高峰发病年龄在8~
施工质量保证计划内容包括:明确质量目标以及()。A.确定组织机构 B.质
最新回复
(
0
)