Which of the following represents the estimated value of the work actually accomplished( )A.ACB.CVC.PVD.EV
选项
A.AC
B.CV
C.PV
D.EV
答案
D
解析
下列哪项代表“实际完成工作的预算价值”
显然挣值“EV”代表此含义。
转载请注明原文地址:https://tihaiku.com/congyezige/2413877.html
本试题收录于:
中级 信息系统监理师题库软件水平考试初中高级分类
中级 信息系统监理师
软件水平考试初中高级
相关试题推荐
下面的例子采用的是()Thefollowingflightshaveavai
Whichofthefollowingrepresentsthees
Whichofthefollowingwouldrequirerea
Allthefollowingareroot-causeanalysi
Whichofthefollowingisnotpartofth
Whichofthefollowingisnotaninputt
ThefollowingdescriptionoftheInterne
Whichofthefollowingisnotthesettin
representstheinformationassetscharac
ThefollowingdescriptionoftheInterne
随机试题
[originaltext]AFrenchtouristhighlypraisedforrescuingatwo-year-oldg
Thedesireforachievementisoneoflife’sgreatmysteries.Socialscienti
提示:星期五晚上有音乐会,Chris得到两张票,打电话给Linda,问她是否有空
属于表见代理行为的构成要件的有( )。A.所谓代理人并没有代理权 B.相对人
储罐罐内壁平整、无毛刺,底板及第一圈板( )cm高度应进行防腐处理,罐外表无大面
按照装饰装修专业工程规模标准,下列幕墙工程属于中型规模的是()。A、幕墙高70m
面试热点:疫情防控与春耕两手抓、两不误 【热点背景】 在疫情防控关头
林老师今年接了一个新班,他应该如何带领同学们组建这个班集体?
下列企业人力资源规划中,将目标定为降低人工成本、维护企业规范和改善人力资源结构的
疏浚与吹填工程合同双方对于采用同一测图分别计算的工程土方量,两者的差值小于或等于
最新回复
(
0
)