问题 with a clear SOW a contractor completes work as specified,but the buyer is not pleased with the result.the contract is considered to be(  )A.incomplete because the buyer is not pleasedB.incomplete because the specs are incorrectC.compete because the contractor meets the terms and conditions of the contractD.complete because the contractor is satisfied

选项 A.incomplete because the buyer is not pleased
B.incomplete because the specs are incorrect
C.compete because the contractor meets the terms and conditions of the contract
D.complete because the contractor is satisfied

答案 C

解析 有一个清晰的工作说明书,且承包商完成了指定工作,但买方不满意结果。合同被认为是(75)。
(75)A.未完成,由于买方不高兴
B.未完成因为规格是不正确的
C.完成了,因为承包商符合合同的条款和条件
D.完成了,因为承包商是满意的