问题
with a clear SOW a contractor completes work as specified,but the buyer is not pleased with the result.the contract is considered to be( )A.incomplete because the buyer is not pleasedB.incomplete because the specs are incorrectC.compete because the contractor meets the terms and conditions of the contractD.complete because the contractor is satisfied
选项
A.incomplete because the buyer is not pleased
B.incomplete because the specs are incorrect
C.compete because the contractor meets the terms and conditions of the contract
D.complete because the contractor is satisfied
答案
C
解析
有一个清晰的工作说明书,且承包商完成了指定工作,但买方不满意结果。合同被认为是(75)。
(75)A.未完成,由于买方不高兴
B.未完成因为规格是不正确的
C.完成了,因为承包商符合合同的条款和条件
D.完成了,因为承包商是满意的
转载请注明原文地址:https://tihaiku.com/congyezige/2412794.html
本试题收录于:
中级 信息系统监理师题库软件水平考试初中高级分类
中级 信息系统监理师
软件水平考试初中高级
相关试题推荐
Sub-contractorsshouldobeythecontract
withaclearSOWacontractorcompletes
随机试题
Charles’shopdoesNOTsell[br][originaltext]W:Well,Charles,Imustsaytha
[img]2018m11s/ct_eyyjsaz2017j_eyyjsacloze_0091_201809[/img]Genealogy,thest
In1689,theBillofRights,whichensuredthattheKingwouldneverbeableto
Ourassociation,whichhasconsistentlypressedforgreateremploymentopportuni
Theevolutionofsexratioshasproduced,inmostplantsandanimalswithse
[originaltext]M:Hi,Donna,areyouinterestedingoingtoanartexhibitionon
初产妇,宫口开全2小时,胎头棘下2cm,宫缩较前减弱,胎膜已破,胎心120次/分
2020年12月,全国中心城市客运量的同比减少率与同年1月相差:A.不到
某在建工程,建筑高度为28m,地上6层,每层建筑面积为2000m2,设置了室内、
血虚证可以出现A.面色淡白 B.头晕目眩 C.手足发麻 D.妇女经闭
最新回复
(
0
)