When required the perform Integrated Cha
When required the perform Integrated Cha
免费题库
2022-08-02
65
问题
When required the perform Integrated Change Control Process includes ( ),whichis a formally chartered group responsible for reviewing ting approving deferring or rejecting changes to the project and for conveying and communicating such decisionsA.BBCB.CCBC.BCBD.CBC
选项
A.BBC
B.CCB
C.BCB
D.CBC
答案
B
解析
当需要时,执行综合变更控制过程包括变更控制委员会(CCB),这是一个正式的特许团体,负责审查批准推迟或拒绝对项目的变更,并负责传达这些决定。
转载请注明原文地址:https://tihaiku.com/congyezige/2412427.html
本试题收录于:
中级 信息系统监理师题库软件水平考试初中高级分类
中级 信息系统监理师
软件水平考试初中高级
相关试题推荐
Teamsarerequiredformostengineering
Teamsarerequiredformostengineering
Teamsarerequiredformostengineering
Teamsarerequiredformostengineering
Teamsarerequiredformostengineering
Teamsarerequiredformostengineering
TherearedifferentwaystoperformIPb
TherearedifferentwaystoperformIPb
TherearedifferentwaystoperformIPb
TherearedifferentwaystoperformIPb
随机试题
ThreeTipstoImproveYourPublicSpeakingSkills1.Children
[originaltext]M:Pleasehaveaseat,MissGreen.Thanksforcomingin.Didyou
[originaltext]Theround-the-clockavailabilitythatcellphonehavebrought
[originaltext]WhenyoutakeawalkinanyofthecitiesintheWest,youof
赵女士在妇科检查中发现宫颈重度糜烂,宫颈刮片细胞学检查为巴氏Ⅲ级,提示为A.高度
下列各项,不属绝经妇女骨质疏松的常见病因是A.肾精亏虚 B.阴虚内热 C.阴
旅游目的地拥有( )的旅游资源。A.特定性质 B.独特价值 C.稀缺珍贵
从事供港澳活羊中转业务的企业须向所在地直属检验检疫机构申请注册。( )
银行承兑汇票的承兑银行,应当按照票面金额向出票人收取()的手续费。A:千分之一
下列建设工程进度计划编制工作中,属于绘制网络图阶段工作内容的是()。A.确