问题
When required the perform Integrated Change Control Process includes ( ),whichis a formally chartered group responsible for reviewing ting approving deferring or rejecting changes to the project and for conveying and communicating such decisionsA.BBCB.CCBC.BCBD.CBC
选项
A.BBC
B.CCB
C.BCB
D.CBC
答案
B
解析
当需要时,执行综合变更控制过程包括变更控制委员会(CCB),这是一个正式的特许团体,负责审查批准推迟或拒绝对项目的变更,并负责传达这些决定。
转载请注明原文地址:https://tihaiku.com/congyezige/2412427.html
本试题收录于:
中级 信息系统监理师题库软件水平考试初中高级分类
中级 信息系统监理师
软件水平考试初中高级
相关试题推荐
Teamsarerequiredformostengineering
Teamsarerequiredformostengineering
Teamsarerequiredformostengineering
Teamsarerequiredformostengineering
Teamsarerequiredformostengineering
Teamsarerequiredformostengineering
TherearedifferentwaystoperformIPb
TherearedifferentwaystoperformIPb
TherearedifferentwaystoperformIPb
TherearedifferentwaystoperformIPb
随机试题
根据物权法律制度,下列不动产登记中,可以由当事人单方申请的是()。A.买卖
对资产评估报告审核的主要内容不包括( )。A.评估程序的履行情况 B.委托人
Thechangeinthatvillagewasmiraculou
对HBeAg阳性母亲所生下的新生儿行预防乙肝的免疫处理最恰当的方法是A.丙种球蛋
2008年汶川地震,某基金会在赈灾募捐活动中,从某食品企业获得了10000斤大米
简论《开皇律》的主要成就。
如果一股分拆为两股,则分拆后股票价格为分拆前的()。 A.一半B.1
以下货物入境,无须办理检疫审批手续的是()。 A.新鲜水果B.活动物 C
建设单位针对某项目建设投资向银行借款,借款期限5年,项目建设期2年,建成后即投入
甲市某药品经营企业为了使自己经营的药品顺利进入该市某三级甲等医院,就给予该医疗机
最新回复
(
0
)