Many of the activities performed during the preliminary investigation are still being conducted in ( ), but in much greater depth than before.A.analysis phase B.design phase C.implementation phase D.maintenance phase
选项
A.analysis phase
B.design phase
C.implementation phase
D.maintenance phase
答案
A
解析
翻译:在初步调研时完成的许多活动在分析阶段还要继续进行,只是比以前更深入地去做。
A.分析阶段 B.设计阶段 C.实施阶段 D.维护阶段
转载请注明原文地址:https://tihaiku.com/congyezige/2295963.html
本试题收录于:
高级信息系统项目管理师题库软件水平考试初中高级分类
高级信息系统项目管理师
软件水平考试初中高级
相关试题推荐
( )arethefourmajoractivitiesofsof
Duringtheimplementationoftheproject
()arethefourmajoractivitiesofsof
()arethefourmajoractivitiesofsoftw
Manyoftheactivitiesperformedduring
Duringthisphase,theanalystmustmust
Manyoftheactivitiesperformedduring
Duringthisphase,theanalystmustbecom
DefineActivitiesistheprocessofiden
随机试题
[originaltext]M:Sorry,I’mlate,Ihadtostopathomeafterworktoputona
[originaltext]ThespaceshuttleDiscoveryhassafelyreturnedtoearthafte
下列各项中,不应计入产品成本的有( )A.生产车间管理人员的工资 B.专
避雷器构架倾斜,可定性为哪些缺陷性质()(A)危急缺陷(B)严重缺陷(
人格的()是心理健康的重要指标。 A.独特性 B.稳定性 C.整合性
中国人民银行上调金融机构存款准备金率0.5%,这一政策属于( )。A.紧缩性财
我国股份有限公司首次公开发行股票采取()相结合的方式。A:对公众投资者上网发行
一般资料:求助者,男性,61岁,退休干部。 案例介绍:半年前的一天,求助者的老
需要进行专家论证的高大模板工程有()。A.搭设高度8m及以上 B.搭设高度超
(2020年真题)下列影响工程进度因素中,属于承包人可以要求合理延长工期的有(
最新回复
(
0
)