首页
登录
职称英语
Summer holiday camps (夏令营) for children began in the USA over sixteen years
Summer holiday camps (夏令营) for children began in the USA over sixteen years
游客
2025-06-29
18
管理
问题
Summer holiday camps (夏令营) for children began in the USA over sixteen years ago. Today there are【41】than 8,000 summer camps in the United States and every year【42】. four million children pass through their gates【43】June and August. Some【44】 by bus every day from the nearest town.【45】 stay as campers for one or two weeks. Quite a lot of children go off to camp【46】the whole of the summer holiday. The people there are young and【47】 There is good food and lots of interesting things【48】. In many camps children learn things【49】cooking and drawing pictures. Every evening there are camp fires and games. Everyone goes to bed【50】but happy. [br]
选项
A、more
B、many
C、much
答案
A
解析
本题考查的是比较级的用法。鉴于原文中出现了than,首选项是more。 more than表示“超过…,多于…”。故选项A正确。
转载请注明原文地址:http://tihaiku.com/zcyy/4139827.html
相关试题推荐
Summerholidaycamps(夏令营)forchildrenbeganintheUSAoversixteenyears
Summerholidaycamps(夏令营)forchildrenbeganintheUSAoversixteenyears
Summerholidaycamps(夏令营)forchildrenbeganintheUSAoversixteenyears
Summerholidaycamps(夏令营)forchildrenbeganintheUSAoversixteenyears
Summerholidaycamps(夏令营)forchildrenbeganintheUSAoversixteenyears
A.DecemberB.summerC.holidayD.NovemberE.yesterday
A.DecemberB.summerC.holidayD.NovemberE.yesterday
Healways______sometimeplayingwithhischildren,evenwhenheisverytired
—CouldyoutellmethewaytotheSummerPalace?—______.A、AllrightB、Certainly
Summerholidycamps(夏令营)forchildrenbeganintheUSAoversixteenyearsag
随机试题
ReadthefollowingpassageandJillineachblankwithoneword.Choosethecorr
IwouldhavesentE-mailtoyouifI(have)______yourE-mailaddress.hadhad本题
JobSearch.comJobsforstudents,recentgraduatesandpeoplelookingforadven
悬挑式操作平台的悬挑长度不宜大于(),承载力需经设计验收。A.2M B.3M
2018年,某县一农村住户调查资料如下:小李夫妇与2个子女一起生活,女儿8岁,儿
10个月女婴。近1周低热,易哭吵,睡眠不安。体检:面色略苍白,神萎,颈抵抗不明显
能反映个体的成绩在整个群体中所处的相对位置的测验是()。A.学能测验 B.常
某工程项目,建设单位准备通过招标选择一个具有相应资质的监理单位承担施工招标代理和
在规定的期限内,如果市场参考利率高于协定的利率上限水平,则卖方向买方支付市场利率
进度计划的优化方法包括()。A.工期优化 B.费用优化 C.工艺优化 D.
最新回复
(
0
)