Problems resulting in cost blowouts are to be ______in any large-scale engineeri

游客2025-06-15  2

问题 Problems resulting in cost blowouts are to be ______in any large-scale engineering project.

选项 A、expects
B、expected
C、expecting
D、have expected

答案 B

解析 expect是及物动词,横线后并没有宾语成分,根据横线前的be可知,此处应为被动语态。答案是(B)expected。
转载请注明原文地址:http://tihaiku.com/zcyy/4119345.html
最新回复(0)