首页
登录
职称英语
- Your team won a big construction contract for your company last month. Your Ma
- Your team won a big construction contract for your company last month. Your Ma
游客
2025-05-31
19
管理
问题
- Your team won a big construction contract for your company last month. Your Managing Director has asked you to prepare a report on your achievement.
- Write a report to the Managing Director:
- saying what you have prepared for the bidding
- outlining your plans for future work
- telling what kind of help you may need from the company.
选项
答案
Report on our achievement in the construction bidding
The report sets out to describe our success in winning the big construction contract last month as well as plans for future work of the construction.
In the preparation for bidding for the construction, we made a large amount of investigations, including the construction site, the distribution of various wires in the area as well as the cost and profits of the whole project. Based on all the findings and analysis of the investigation, we completed our tender, engineering drawing and estimated budget. It contained all the excellent features of our competitors and excelled all of them in the aspect of daylight and heat design, which enabled us to win the contract.
As for future work, several tasks as follows should be carried out. In the first place, the construction site must be cleaned and leveled off in two weeks. Meantime, designs of the project should be reexamined by another group of engineers in case there should be any inappropriate mistakes. Synchronised with that, relevant equipments and materials for construction must be purchased, inspected and safely kept in the construction site for the course of construction. The preparation and construction office is responsible for these two parts. Above all, temporary water and electricity must be switched in immediately. Construction work will get started once preparation work gets finished.
Since it’s a very big project and its success is essential to our company, adequate provision of personnel and funds must be assured. Specific demands are listed in the documents appended.
解析
题目要求写一份报告。根据题目要求可知,这是一份写给总经理的关于赢得建设工程投标的报告。要求首先说明为竞标所做的准备,接下来说明将来的工作计划,最后说明需要公司提供的帮助。写作时应注意条理清晰,层次分明,注意前后文衔接及语意逻辑关系,同时应注意避免语法、拼写等错误。
转载请注明原文地址:http://tihaiku.com/zcyy/4098422.html
相关试题推荐
Welcome欢迎Welcometoourcompany.
Marketing:howtoensurethatacompany’smarketingliteratureisattractiveto
Motivation:theimportanceofmotivatingstaffatalllevelsofacompanySugges
StaffRelations:theimportanceofacompanyprovidingarangeoffacilitiesfor
QualityControl:theimportancetoacompanyofmonitoringthequalityofitsgo
Dealwithanythingnotcovered提议讨论尚未商谈的事项Nowwecangetthecontractfinalized.
TaskSheet:StaffPromotion:TheHRManagerofyourcompanypropose
FortwocandidatesYourcompanyaresuedforillegalarbitragewithastockbroke
FortwocandidatesYourcompanyisplanningtoestablishafactorywithanother
Task10RelocatingtoNewPremisesThecompanyyouworkforisgrowingrapidlya
随机试题
观点一:现代工业的装备条件、农业科技的进步与创新为现代农业现代化提供了强大的动力
下列关于不同部位防护栏杆或防护门的设置要求,正确的是()。A.各类垂直运输接料
枕骨大孔疝的临床表现不包括:( )A.昏迷 B.呕吐 C.瞳孔忽大忽小
教师的人格、品性、德操对学生人格的形成起着奠基作用,这是教师职业道德()的体现
关于基坑轻型井点说法,正确的有()。A、基坑面积较大时宜采用环形井点 B、土质
()是判断是否构成“操纵市场”的关键因素。A.内幕交易 B.实施了歪曲
血小板聚集主要依靠是A:血小板数量B:血小板GPⅡb/ⅢaC:血小板膜蛋白G
窦房结功能衰竭并发心脏骤停的心跳复苏药是A、普萘洛尔 B、氯化钙 C、异丙肾
如图所示的四种用具在正常使用的过程中,属于省力杠杆的是:()A. B.
水谷精气与清气相结合,关系到( )。A.宗气的生成 B.卫气的生成 C.营
最新回复
(
0
)