首页
登录
职称英语
What did the several hundred college students compete to build recently in Washi
What did the several hundred college students compete to build recently in Washi
游客
2025-03-28
10
管理
问题
What did the several hundred college students compete to build recently in Washington,DC? [br]
Experts say in the near future, many houses in the United States will be powered by energy from the sun, Many people in Washington, D. C., recently were able to see what some of those homes might look like. Several hundred college students from across the country took part in a competition to see who could build the best solar-powered house. The United States Department of Energy organized the competition.
Students from fourteen colleges and universities took part in this Solar Home Competition. Student teams competed in a series of ten contests to see who could design, build and operate the best house powered only by the sun. The solar homes were built on the National Mall, the grassy open area between the United States Capitol building and the Washington Monument. The solar houses were set up in the middle.
Each team included at least twenty students of design, architecture and building sciences. The students gained the money to buy equipment and materials for their house. Each house cost as much as $250,000 to build.
A solar-powered house has a roof designed to take in the heat of the sun and change it to energy, That power is then stored in a battery bank which supplies power to the whole house.
As part of the competition, the teams were expected to spend most of the day in their homes doing normal activities. The activities used electricity powered by the sun. For example, the students cooked food, used computers, operated lights and washed clothes in Machines. They even drove around the solar village in electric cars powered by a solar battery.
The competition is designed to show Americans that solar energy works, because the use of solar energy in the United States is less than in other parts of the world. Only about 20, 000 American homes are solar-powered.
选项
答案
$250,000.00
解析
转载请注明原文地址:http://tihaiku.com/zcyy/4015725.html
相关试题推荐
WhatdidtheseveralhundredcollegestudentscompetetobuildrecentlyinWashi
WhatdidtheseveralhundredcollegestudentscompetetobuildrecentlyinWashi
WhatdidtheseveralhundredcollegestudentscompetetobuildrecentlyinWashi
StudentsofEnglishareadvisedtotryto______themeaningofanewwordfrom
Atallbuildingisusuallyequippedwithseveralelevators,soitdoesn’tmatter
TheUnitedNationsWorldFoodProgramsays______couldpushonehundredmillion
TheUnitedNationsWorldFoodProgramsays______couldpushonehundredmillion
Severaltrialeffortsinthe1980sprovedthatitwasfinancially______torest
Justasthereareoccupationsthatrequirecollegeorevenhigherdegrees,_____
Ifthereistheneedtocompeteinacrowd,tobattle______theedgethesurest
随机试题
长期以来,中国制造一直是偷工减料(comer—cutting)和廉价商品的同义词。过去,几乎没有哪个西方奢侈品品牌愿意承认自己是在中国生产的。不过,随着
Othersfinddifficulttogetupinthemorninganddonotseemabletogetgoing
A.竹叶 B.竹沥 C.竹茹 D.天竺黄 E.淡竹叶清化热痰,清心定惊的
下列哪项不是慢粒病人进入加速期的常见表现A.不明原因高热 B.原有效药物变为无
359.共产党员突击队的基本组织形式有:生产型、()、服务型等。 A.技术型
政策性收益是指由于某些政策、法规的变动而导致的个体收益,这种收益不会导致整个社会
共用题干 某国有独资公司,生产经营规模不大,当地财政部门在对该公司进行执法检查
电压互感器配置原则为()。A.每段主母线和旁路母线都接一组电压互感器 B.
高层建筑的采暖系统安装工艺流程中,采暖器具安装后的工序有()。A、支架安装B、
在工程项目施工质量管理中,施工质量控制应以控制()的因素为基本出发点。A.人
最新回复
(
0
)