首页
登录
职称英语
You wouldn’t expect an Information Age company like Intel to get on the wron
You wouldn’t expect an Information Age company like Intel to get on the wron
游客
2025-03-22
36
管理
问题
You wouldn’t expect an Information Age company like Intel to get on the wrong side of environmentalists, but the company’s recent 42 billion expansion at Rio Rancho, New Mexico, plunged the world’s largest semiconductor maker into an age-old Western problem; water rights. Chip plants consume millions of gallons of water a day, mainly to wash microscopic dirt from the surface of chips. That’s a problem in the dry West, where, as Twain remarked, whiskey is for drinking, water is for fighting about.
During construction of the new 1. 3 million-square-foot chip-making plant, which starts production this month, residents and activists complained that the company’s expanding thirst would be too great a drain on local supplies. After weeks of public hearings, the state of New Mexico last year granted Intel 72% of the water it requested.
The strife at Rio Rancho is the most intense the industry has faced. "I think it sensitized us," says Howard High, spokesman for Intel. "We have a lot of efforts under way to try and minimize the amount of water we use. " Current conservation efforts may not work for an industry that in North America is expected to double in size to $ 75 billion in sales in the next three years.
The trend is to reuse treated wastewater from chip cleaning in places such as cooling towers and air-conditioning systems. Motorola employs such methods in Phoenix and Austin. Recycling water for chip cleaning is the most logical approach. But the technology to make ultra-pure water for such a closed-loop system is still too costly.
New technologies could eventually take the water out of chip cleaning. One company, Radiance Services, a six-person start-up based in Bethesda, Maryland, holds patents for a new "dry cleaning" method. Using laser light and inert gas (惰性气体) to lift impurities (杂质,不洁物) from surfaces of a chip, Radiance claims its process can clean as effectively as the current water-based methods. [br] One disadvantage of reusing treated wastewater is______.
选项
A、its cost is too high
B、its productivity is too low
C、the resulting water is not ultra-pure
D、the method is not logical
答案
A
解析
细节题。倒数第二段最后一句,But the technology to make ultra—pure water for such a closed—loop system is still too costly.……这一技术的成本仍太高了。A符合这个意思。
转载请注明原文地址:http://tihaiku.com/zcyy/4007949.html
相关试题推荐
You______includethissection.It’snotnecessary.A、wouldn’tB、couldn’tC、don’t
Youwouldn’texpectanInformationAgecompanylikeInteltogetonthewron
Youwouldn’texpectanInformationAgecompanylikeInteltogetonthewron
Youwouldn’texpectanInformationAgecompanylikeInteltogetonthewron
Man:I’mgoingtodropmyInformationScienceclass.Itmeetstooearlyinthem
Theyhavedecidedonafinaldatebywhichtheyexpectthateveryone______theco
AnAustraliancompanyispreparedtogiveawaycolorTVsets,furcoats,dia
AnAustraliancompanyispreparedtogiveawaycolorTVsets,furcoats,dia
You______includethissection.It’snotnecessary.A、wouldn’tB、couldn’tC、don’t
Whatisthemainsubjectofthispassage?[br]Whatdoes"thecompany’sexpandin
随机试题
Aristotledefinedafriendas"asinglesouldwellingintwobodies".Member
A)AfederalappealscourtonWednesdayforthefirsttimeemployedalandmarkSu
下列关于企业愿景、使命与战略目标的说法,错误的是()。A.企业愿景不等同于企业
甲破解了张某的股票账户密码,偷偷登录其账户买卖股票“练手”,案发时造成张某股票账
下列选项中,属于形成权的是()A.物权 B.人身权 C.债权
8岁小儿,因发热4天,呕吐2天,惊厥1次收入住院。人院后患儿嗜睡明显,又反复惊厥
以下关于全面质量管理取得成功的关键因素中,错误的是:A.高层管理者的支持 B.
子宫颈癌临床分期I2是指A.肉眼见宫颈表浅浸润 B.癌瘤累及宫旁,无明显阴道浸
受扭实心圆杆的许可荷载为T,若将其横截面面积增加一倍,则其许可荷载增大为()
我国人民币贷款利率按贷款期限划分,可分为短期贷款利率与中长期贷款利率。( )
最新回复
(
0
)