首页
登录
职称英语
For centuries Dutch engineers have been fighting a war against water. Their m
For centuries Dutch engineers have been fighting a war against water. Their m
游客
2025-03-04
11
管理
问题
For centuries Dutch engineers have been fighting a war against water. Their main enemy is the sea. A large part of the country is below sea level. In fact, Holland is also called the "Netherlands" which means "low land. " Very tall and strong walls, called dykes, have built to keep out the sea. But in very rough weather the sea may suddenly burst through a dyke. Great damage can be caused by floods when this happens.
Three large rivers are also part of the problem. They flow through Holland into the North Sea. They have cut many passages across the country. At low tides, the rivers flow into the sea as usual. But at high tide, the sea can flow into the rivers! This is because the land is so low.
The battles against the water never end, but they have made Holland a bigger and bigger country. In order to prevent floods, the engineers take, or reclaim, land that was under water. The Dutch have been reclaiming land for seven hundred years.
Land is usually reclaimed from a passage between islands. Two dykes are built across the passage, so they block the water between them. Then the engineers dig long canals and pump the water into them. At low tide, the canals empty the water into the sea.
Because the land is so low, water from the sea and rivers can rise up through the ground. For this reason, the pumps continue working. The dykes contain gates, and through these the water is pumped out. In many parts of Holland, pumps must be working all the time. If they stopped, there will be very bad floods.
A piece of reclaimed land is called
polder
, and Holland has thousands of polders. Some are very large, but others are quite small. There are farms on many of the polders. Corn and other crops grow well on the drained land, and it gives good grass for cattle. Many small towns and villages stand on polders. Even Amsterdam’s great airport was built on reclaimed land. [br] The word "polder" means______.
选项
A、a piece of newly-claimed land
B、a small island
C、a newly built dyke
D、a long canal
答案
A
解析
语义词义题。最后一段提到:A piece of reclaimed land is called polder(重新收回的土地叫开拓地)。所以答案是A。
转载请注明原文地址:http://tihaiku.com/zcyy/3982396.html
相关试题推荐
Sheleaned______thewallwhileshewasspeakingtoherfriend.A、toB、againstC、
Therewasalargecrowdinthesquare______againstthewar.A、protectingB、protes
ForcenturiesDutchengineershavebeenfightingawaragainstwater.Theirm
ForcenturiesDutchengineershavebeenfightingawaragainstwater.Theirm
ForcenturiesDutchengineershavebeenfightingawaragainstwater.Theirm
Acountrymustalwaysbe________guardagainstspiesandinvaders.A、inB、toC、w
Sheleaned______thewallwhileshewasspeakingtoherfriend.A、toB、againstC
Itishightimethattheinternationalcommunity______togethertofightagainst
Themysterioustigerhasbeenasymbolofpowerandstrengthforcenturies.
Themysterioustigerhasbeenasymbolofpowerandstrengthforcenturies.
随机试题
Abagcontains3red,4white,and5bluemarbles.Jasonbeginsremovingmarbles
StudentsofUnitedStateshistory,seekingtoidentifythecircumstancesthat
A.整个负实轴 B.整个虚轴 C.虚轴左面平行于虚轴的直线 D.虚轴左面的
关于路用水泥混凝土配比设计,试回答下列问题。(16)水泥混凝土配合比设计在兼顾经
下列关于建筑物折旧年限法内容的表述中,正确的有( )。A.建筑物的有效年龄可能
主动转运的特征不包括A:由低浓度区向高浓度区扩散 B:不需要载体参加 C:消
关于机电产品国际招标,下列投标资格不合格的投标人是()。A.法国公司与德国公司组
根据我国《公司法》,董事会会议的表决实行( )原则。A.多数通过 B.资本多
评标委员会成员对需要共同认定的事项存在争议时,下列处理正确的是()。A.应当通知
某施工企业采购一批材料,出厂价3000元/t,运杂费是材料采购价的5%,运输中材
最新回复
(
0
)