首页
登录
职称英语
Toronto’s third City Hall, now known as Old City Hall, was designed by Edwar
Toronto’s third City Hall, now known as Old City Hall, was designed by Edwar
游客
2025-03-03
15
管理
问题
Toronto’s third City Hall, now known as Old City Hall, was designed by Edward James Lennox and declared open on Sept. 18, 1899.
Created to provide more space for city officials, it turned out to be the largest building in the city and the largest city building in North America at the time.
Lennox took three years to design the City Hall and it took 11 years to build it. Contemporaries believe that the odd carvings above the Queen Street entrance were actually caricatures (漫画) of councilors at the time.
Lennox even included himself in the caricatures, on the west side of the central arch, and left a strange signature in the stonework of the link portions of the building.
The third City Hall was originally used as councilors’ offices and legal offices, but it is used only as a courthouse today.
When the fourth City Hall (the one we know today) was declared open in 1965, Old City Hall was threatened to be pulled down. It was saved by a group of people called the "Friends of Old City Hall."
The clock tower stands parallel with the middle of Bay Street, rather than with the center of the building. The bells in the tower were not installed until the building opened. Old City Hall was declared a historical site in 1989.
The entire structure cost more than $ 2.5 million to build at the time. This is equal to $ 53 million today. [br] Old City Hall was constructed in ______years.
选项
A、3
B、7
C、9
D、11
答案
D
解析
细节题。定位到文章第三段第一句“Lennox took three years to design the City Hall and it took 11 years to build it.”可知,Lennox花了三年时间设计了市政厅,花了11年时间才建成,即市政厅的建设周期长达11年。故选D。
转载请注明原文地址:http://tihaiku.com/zcyy/3981367.html
相关试题推荐
Whynothaveanewmachinedesigned?—______.I’llhavesomeonedoitsoon.A、I
Afterbeingtestedinmanyways,thisnewly-designedmachinewill______inthene
Afterbeingtestedinmanyways,thisnewly-designedmachinewill______inthene
W:Operator,Iwanttomakeaperson-to-personcalltoToronto,Canada.Thenumbe
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Afterbeingtestedinmanyways,thisnewly-designedmachinewill______inthen
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
AfterbeingtestedinmanyWays,thisnewly-designedmachinewill______inthen
随机试题
ItwasachillyNovembereveninginNewYorkCity,andmydaughterandIwer
Thenowextinctpassengerpigeonhasthedubioushonorofbeingthelastspe
某反应为三级反应,则反应速率常数的单位是( )。A.s-1 B.dm3·mo
关于法与道德的论述,下列说法中正确的是哪些?()《》()A.在人类社会的早期
会计凭证按照()分类,可以分为原始凭证和记账凭证。A.用途和填制程序 B.形
TACTRules规定,危险品处理费归()所有。A.承运人 B.出票航空
发现周期律的基础是原子序数而不是原子量,对门捷列夫的元素周期律进行补充的科学家是
我刚接任三(2)班班主任老师,全校闻名的“小魔王”—阳阳成为了我的学生,开学没几
下列选项中,属于全国人民代表大会职权的有:A.解释宪法 B.监督宪法的实施
某装机容量50万kW的水电站工程建于山区河流上,拦河大坝为2级建筑物,采用碾压式
最新回复
(
0
)