首页
登录
职称英语
In a plan to stop the erosion of East Coast beaches, the Army Crops of Engineeri
In a plan to stop the erosion of East Coast beaches, the Army Crops of Engineeri
游客
2025-02-25
20
管理
问题
In a plan to stop the erosion of East Coast beaches, the Army Crops of Engineering proposed building parallel to shore a breakwater of rocks that would rise six feet above the waterline and
act as a buffer, so that it absorbs
the energy of crashing waves and protecting the beaches.
选项
A、act as a buffer, so that it absorbs
B、act like a buffer so as to absorb
C、act as a buffer, absorbing
D、acting as a buffer, absorbing
E、acting like a buffer, absorb
答案
C
解析
本句展示了and的判定意义。第一个and表明act应与rise并列,而不是与building并列,排除D、E;第二个and表明absorb应与protect形式一致,由此选C。absorbing与protecting并列作rise和act的伴随结果。此句中的parallel to shore修饰a breakwater,由于a breakwater后还有定语从句修饰,所以把parallel to shore前置。
转载请注明原文地址:http://tihaiku.com/zcyy/3972659.html
相关试题推荐
Inastudyofmorethan8,000peopleusingtenbeachesontwooftheGreatLakes
Thenumberofundergraduatedegreesinengineeringawardedbycollegesandunive
InaplantostoptheerosionofEastCoastbeaches,theArmyCropsofEngineeri
Usingthetechniquesemployedbygeneticengineering,anewspeciesofmicroorga
RUBBER:TIRE::A、skin:hairB、silver:cutleryC、window:paneD、erosion:ironE、piece
RUBBER:TIRE::A、skin:hairB、silver:cutleryC、window:paneD、erosion:iron
Consumersmaythinkthatgeneticengineeringoffoodsissomethingnew,buthuma
The______ofimpactcratersonVenussuggeststhaterosionmayhavesmoothedits
随机试题
A.锥面 B.单叶双曲面 C.双叶双曲面 D.椭圆抛物面
混凝土试块试压后,某组三个试件的强度分别为26.5MPa、30.5MPa、35.
轴间,需要增加的框架柱数量是:() A.7根 B.8根 C.9根
A.朗格汉斯细胞 B.角质细胞 C.棘层细胞 D.黑色素细胞 E.梅克尔
下列不属于条件反射的反射活动是()。A.膝跳反射 B.体育运动动作 C.技
最后一个鸡蛋郑渊洁 ①整个鸡家族都不甘心自己在地球上的地位——任人宰割,供人食
期货公司设立、变更、解散、破产、被撤销期货业务许可的,期货公司依法应当在()上
根据《涉外民事关系法律适用法解释(一)》,下列在我国法院提起的诉讼中,构成涉外民
(2017年真题)能有效防治水泥稳定土基层裂缝的措施有()。A.采用塑性指数较
登记账簿时,发生的空行、空页一定要补充书写,不得注销。()
最新回复
(
0
)