首页
登录
职称英语
Matisse’s art, with its spectacular immediacy and its mysterious depths, pos
Matisse’s art, with its spectacular immediacy and its mysterious depths, pos
游客
2025-02-19
35
管理
问题
Matisse’s art, with its spectacular immediacy and its mysterious depths, poses confounding problems for analysis When Hilary Spurling writes of The Piano Lesson that “the picture can not be confined to any single source or meaning,” she might be writing of any of Matisse’s works. Picasso’s themes, with their collage of traditional signs and symbols, are far more susceptible to conventional iconographic analysis than anything in Matisse. Similarly, the cubism of Picasso and Braque, while rejecting traditional perspective, can nevertheless be studied as an inversion of traditional norms, using the same tools that one uses to study those norms. But the solutions that Matisse arrives at are always idiosyncratic and tend to be unrelated to any system of ideas. Intuition is his only system. [br] The passage identifies which of the following as a reason that Matisse’s art can confound analysis?
选项
A、Traditional analytical tools are not well suited to Matisse’s art.
B、Matisse’s art is marked by a freedom from systematic influence.
C、The norms that Picasso and Braque rejected were not ones that Matisse rejected.
答案
A,B
解析
由第四句可知,毕加索和布拉克的艺术能用传统工具研究,因此马蒂斯的不能,选项A正确。B项对应第五句,马蒂斯不与任何思想体系有关。C项我们不知道马蒂斯是否拒绝了这些规则。
转载请注明原文地址:http://tihaiku.com/zcyy/3964288.html
相关试题推荐
Matisse’sart,withitsspectacularimmediacyanditsmysteriousdepths,pos
Matisse’sart,withitsspectacularimmediacyanditsmysteriousdepths,pos
随机试题
Theblind,overweightpatientinthewheelchairhasterriblepaininherbac
[originaltext]W:Now,sir,(1)I’msorrytohavekeptyouwaiting.Ihadtolook
Everyyearthroughouttheworld【C1】______6,000earthquakesaredetected.The
[originaltext]M:Excuseme,canyoutellmeifthisbusgoestoVictoriaStatio
以下关于UML(UnifiedModelingLanguage,统一建模语言
某系统磁盘数据块的大小为1024KB,系绕磁盘管理采用索引文件结构,每个索引指针
()起源论者认为,教育起源于儿童对成人无意识的模仿。
甲乘坐长途公共汽车时,误以为司机座位后的提包为身边的乙所有(实为司机所有);乙
下列有关企业价值评估的计算公式中,正确的有()。A.本期净经营资产增加=本期净负
项目成本控制的原则包括()。A.成本最低化原则 B.全面成本控制原则
最新回复
(
0
)