首页
登录
职称英语
"Engineering Class"[img]2012q1/ct_etoefm_etoeflistz_1501_20121[/img] [br] What d
"Engineering Class"[img]2012q1/ct_etoefm_etoeflistz_1501_20121[/img] [br] What d
游客
2025-02-08
29
管理
问题
"Engineering Class"
[br] What does the professor think about computer sensors for buildings?
[Narrator] Listen to part of a lecture in an engineering class.
[Professor]
Because every earthquake presents us with unique conditions, it’s difficult to anticipate the stresses that
will ultimately affect the structures we design and build. So our challenge is to try to design a building Q46
that will be as... safe as possible... for all types of earthquakes. Besides that, during the past decade,
the expectations for earthquake-resistant structures have changed. Whereas in the past, it was considered
adequate for a building not to collapse during an earthquake, now insurance companies and...
and even clients... they’re demanding buildings that will be able to maintain their structural integrity
through an earthquake and, uh... remain sound... after the earthquake subsides.
So, in recent years were developed several techniques for building more earthquake-resistant Q46
structures: For relatively small buildings, all we have to do, really, is bolt the buildings to their foundations
and, uh... provide some support walls. Remember these walls are referred to as shear walls in
your textbook. They’re made of reinforced concrete, and by that I mean concrete with steel rods embedded
in it. This not only strengthens the structure but... but it also diminishes the forces that tend to
shake a building during a quake. And in addition to the shear walls that surround a building, shear walls
can be situated in the center of a building around an elevator shaft or a stairwell. This is really an excellent
reinforcement. It’s commonly known as a shear core, and it contains reinforced concrete, too.
Okay. Let’s talk about walls. Walls can also be reinforced, using a technique called cross-bracing Q47
Imagine steel beams that cross diagonally from the ceiling to the floor... and this happens on each
story in a building. So before the walls are finished, you can see a vertical row of steel x’s on the structure.
And this cross-bracing tends to make a building very rigid, and consequently, very strong.
But besides steel reinforcements, engineers have also devised base isolators, which are positioned
below the building, and their purpose is to absorb the shock of the sideways shaking that can undermine
a building and cause it to collapse. Most of the base isolators that are currently being used are made of Q48
alternating layers of steel and synthetic rubber. The steel is for strength, but, uh... the rubber absorbs
shock waves. In higher buildings, a... a moat... of flexible materials allows the building to sway during
seismic activity. Or... or large rubber cylinders support all of the corners of the building, and in
between each floor, and they allow the building to sway during an earthquake. So, you can see that
these alternatives are quite different from cross-bracing or shear walls.
So the combination of reinforced structures and flexible materials has been proven to reduce earth
quake damage. But even these engineering techniques are insufficient if the building has been constructed
on filled ground. Soil used in fill dirt can lose its bearing strength when subjected to the shock Q49
waves of an earthquake, and the buildings constructed on it can literally disappear into the Earth. So, in
areas where earthquakes are known to occur, it’s important to understand the terrain, and you have to
be sure that the ground is either solid or it’s been adequately prepared.
Okay, let’s assume that we do everything right... we choose and prepare the construction site and
we design a building with plenty of reinforcements and flexible materials. With cross-bracing, we probably Q50
have a building with the strength to holdup under earthquakes, even those of relatively high magnitudes.
And building, what about the occupants? Well, the structure may be
strong, but the furniture will probably be overturned or shifted during the earthquake and that could
result in major injuries for the people inside. So, now that we’ve made progress in solving the problem
of how to preserve the buildings, uh... one of the more recent areas of research is how to better protect
the occupants during an earthquake.
One interesting possibility is to design buildings that house a series of pistons, and these pistons Q51
are filled with fluid and controlled by sensors in a computer. So... by analyzing signals from the sensors,
the computer should be able to determine the magnitude of an earthquake in progress... and
when it does that, it can trigger electromagnets in the pistons to increase or decrease the... the rigidity
of the shock absorbers... built into the structure. If the earthquake is minor, then the building can be
programmed to sway gently, and the people and everything else inside get a safe ride. But during high-magnitude
earthquakes, the shock absorbers can freeze the building to prevent it from shaking at all. So
the beauty of the concept is that the computer sensors work very quickly, reacting within one one-thousandth
of a second, and they can run on battery power since the electrical system usually fails during an
earthquake. Will the concept work? Well, the National Science Foundation is supporting more research Q51
into the potential of pistons, and the results so far are promising.
选项
A、He thinks this is a superior. method for preserving buildings.
B、He finds the research on sensors for pistons very encouraging.
C、He is more concerned about the potential for people to be injured.
D、He doubts that the concept will result in design improvements.
答案
B
解析
He finds the research on sensors for pistons very encouraging.
转载请注明原文地址:http://tihaiku.com/zcyy/3947992.html
相关试题推荐
[img]2012q1/ct_etoefm_etoeflistz_0321_20121[/img][br]Whatcanbeinferredabou
[img]2012q1/ct_etoefm_etoeflistz_0314_20121[/img][br]Whatdoestheprofessorm
[img]2012q1/ct_etoefm_etoeflistz_0314_20121[/img][br]Whydoestheprofessorme
[img]2012q1/ct_etoefm_etoeflistz_0314_20121[/img][br]Howdidthemail-orderbu
[img]2012q1/ct_etoefm_etoeflistz_0314_20121[/img][br]Whatisthetalkmainlya
[img]2012q1/ct_etoefm_etoeflistz_0307_20121[/img][br]Whatcanbeinferredabou
[img]2012q1/ct_etoefm_etoeflistz_0307_20121[/img][br]Theprofessordescribesw
[img]2012q1/ct_etoefm_etoeflistz_0307_20121[/img][br]Listenagaintopartoft
[img]2012q1/ct_etoefm_etoeflistz_0307_20121[/img][br]Whydoestheprofessorte
[img]2012q1/ct_etoefm_etoeflistz_0301_20121[/img][br]Inwhichsubjectareasmu
随机试题
旅行社在选择旅游中间商时应考虑其所处的地理位置,即旅游中间商是否位于( )。A
某施工单位对所收集的电子文件进行编码时,对于图像文件的类别代码是()A.T B
材料二中,中国共产党对富农实行减租减息政策的目的不包括()。 A.集中力量打击
细胞周期时间的差异取决于( )A.G1期 B.S期 C.G2期 D.M期
苏轼评论书法有“意态自足,号称神逸”之语,此话褒奖的是( )。A.张旭 B.
共用题干某品牌汽车销售商为了对该品牌汽车的销售情况做出准确判断,需要对汽车市场
BT公司是一家内燃机生产企业。最近,公司质量部刘经理感到非常困惑。刘经理是一年前
某分部工程有两个施工过程,各分为4个施工段组织流水施工,流水节拍分别为3、4、3
施工现场暂时停止施工的,施工单位应当做好现场防护,所需费用由()承担,或者按照
(2020年真题)某拟建项目,建筑安装工程费为11.2亿元,设备及工器具购置费为
最新回复
(
0
)