首页
登录
职称英语
Problem Description of the Flood Early Warning SystemVocabulary and Expressions
Problem Description of the Flood Early Warning SystemVocabulary and Expressions
游客
2025-01-26
42
管理
问题
Problem Description of the Flood Early Warning System
Vocabulary and Expressions
physically-based algorithm deploy populace
calibrate adaptive illiterate fuse [br] Given a suite of robust adaptive distributed algorithms for flood warning, it will benefit the developing countries.
The Problem Description of the Flood Early Warning System
In developing countries, warning communities of an incoming flood is an expensive proposal given their limited resources. The equipment necessary for early warning flood systems is expensive and centralized to support flood detection schemes that are computationally complex. This project explores new techniques for distributing the computation of flood detection within a wireless sensor network, grounding the research in reality through the design and installation of an early warning system for flooding in a developing country.
Sensor networks for flooding do not exist in a real-time automated capacity within developing countries. We are developing such a sensor network and examining how to distribute and adapt the flood prediction calculation. Current flood prediction relies on physically-based models requiring large amounts of data in order to calibrate the model, and significant computation power to compute the model. Neither of these being feasible on a sensor network as data,storage and computing power are limited, we are working on statistical algorithms capable of online, distributed computation.
Given a suite of robust adaptive distributed algorithms for flood warning, we are planning to implement these algorithms on a system that can be deployed within a developing country. This poses a number of challenges, ranging from survival in harsh flood environments, lack of trained personnel to maintain the system, and an illiterate populace to warn. Designing and implementing a system that addresses these issues poses interesting engineering problems. Key research questions here include: How does each sensor node measure its environment? How does each sensor communicate with the rest of the network, and convey its ongoing status given the worst weather conditions possible on a river? How and where should the information from the sensors be processed and fused?
选项
A、正确
B、错误
答案
A
解析
该表述是对原文相关内容的同义表述,因此本题正确。
转载请注明原文地址:http://tihaiku.com/zcyy/3929720.html
相关试题推荐
Becauseitisnotaseriousproblem,wearenotnecessarytotakestrictmeasure
Nuclearpower,withallitsinherentproblems,isstilltheonlyoptiontoguara
Inspiteofaproblemwiththefaultyequipment,someveryusefulworkwasaccom
Yourkindnessingiving______totheconsiderationoftheaboveproblemwillbe
Theonlyproblemwiththedebatelastweekwasthatthebeginningsoundedmorel
Thecentralproblemofeconomicsistosatisfythepeople’sandnation’swan
Thecentralproblemofeconomicsistosatisfythepeople’sandnation’swan
Thecentralproblemofeconomicsistosatisfythepeople’sandnation’swan
Thecentralproblemofeconomicsistosatisfythepeople’sandnation’swan
Thecentralproblemofeconomicsistosatisfythepeople’sandnation’swan
随机试题
Today,theTowerofLondonisoneofthemostpopulartourist【1】andattracts
Iinterviewedsomepeople___________________________(他们是最优秀的演说家和畅销书的作者).whoa
[originaltext]Stresscomesinallshapesandsizes,andhasbecomepervasi
对在同一配置单元内设置有两种类型的灭火器的场所进行验收检查时,下列检检查结论中正
某国东部沿海有5个火山岛E、F、G、H、I,它们由北至南排列成一条直线,同时发现
免疫抑制剂中均含有环戊烷多氢菲,通过抑制巨细胞吞噬和游走作用等机制发挥抗炎作用的
阅读《爱莲说》教学实录(片段),回答问题。 师:下面,我们来品析第一段中描写莲
孕妇不宜使用的止血药是()。A.血余炭B.地榆C.蒲黄D.艾叶E.炮姜
规划目标集中体现了发展导向和需要达到的发展水平。规划目标包括()。A.总体目标
中标人确定后,招标人应当向中标人发出中标通知书,中标人放弃中标项目的,应该()A
最新回复
(
0
)