首页
登录
职称英语
What materials were not used for road surfaces during the last century? [br] [o
What materials were not used for road surfaces during the last century? [br] [o
游客
2024-12-27
36
管理
问题
What materials were not used for road surfaces during the last century? [br]
Mr. Jones: What materials were used for road surfaces during the last century?
Engineer: Usually they were gravel and macadam. Tars and asphalt were originally used only as coverings, but later they were used as binders and finally as hot mixtures.
Mr. Jones: Concrete is a modem material as far as road - building goes, isn’ t it?
Engineer: Relatively speaking. But you might be surprised to know that a concrete road was built as early as 1893 in Ohio. But it was only 5 miles long. More extensive projects were not undertaken until much later, around 1912 or 1913.
Mr. Jones: This was because of the increase in traffic?
Engineer: That’ s right. Especially in the use of heavy tracks. More rigid pavements, such as concrete and brick, became a necessity. For light traffic, though, water-bound macadam, gravel, sand clay, and bituminous mixtures were still used.
Mr. Jones: What are turnpikes usually made of?
Engineer: Turnpikes are usually made of reinforced concrete about 8 to 10 inches thick, placed on a granular sub-base, which in turn is placed on a well - tacked earth subgrade. Of course, the construction depends a lot on the local climate, rainfall, soils, and so on.
Mr. Jones: How do you mean--climate?
Engineer: Frost is one of the main problems. For example, in Maine, where frost is quite frequent, the typical turnpike construction is a thin top layer of asphaltic concrete on a base layer of sand and gravel placed on a 36 - inch, frost - free, granular subgrade.
Mr. Jones: What is the width of these roads?
Engineer: The early two - lane roads were about 20 feet wide. But with higher automobile speeds, the width requirements increased greatly. To give you an example, the Pennsylvania Turnpike has two 12 - foot lanes in each direction, separated by a median 10 feet wide. On each side there is a 10 -foot stabilized shoulder, marking a total width of 78 feet. The New Jersey Turnpike averages 100 feet in width, with three lanes in each direction.
Mr.Jones: I guess wider roads are being built every day.
Engineer: That’ s right. Sometimes you think that, no matter how good a road you build, the speed and weight of vehicles will always be one step ahead.
选项
A、Roads.
B、Streets.
C、Lanes.
D、Highways.
答案
D
解析
这个题可以用排除法。Roads, streets, lanes are not heavy surfaces. 只有turnpikes are extensive surfaces高速公路。
转载请注明原文地址:http://tihaiku.com/zcyy/3886890.html
相关试题推荐
Whatmaterialswerenotusedforroadsurfacesduringthelastcentury?[br][o
Stupendouspriceswerepaidinahistoricsaleof19th-and20th-centuryavant-g
Stupendouspriceswerepaidinahistoricsaleof19th-and20th-centuryavant-g
Stupendouspriceswerepaidinahistoricsaleof19th-and20th-centuryavant-g
Stupendouspriceswerepaidinahistoricsaleof19th-and20th-centuryavant-g
TheEconomicSituationofJapaninthe18thCenturyIntheeight
TheEconomicSituationofJapaninthe18thCenturyIntheeight
Insixteenth-centuryItalyandeighteenth-centuryFrance,waningprosperity
Insixteenth-centuryItalyandeighteenth-centuryFrance,waningprosperity
Insixteenth-centuryItalyandeighteenth-centuryFrance,waningprosperity
随机试题
[originaltext]M:Haveyoufoundthetroublewiththecar?W:Notyet.Theengin
[originaltext]M:Doyougotoworkataquarterpasteight,Jane?W:Yes,Ido.
Here’showthePacificNorthwestispreparingfor"TheBigOne".It’sthemot
前列腺炎的主要临床表现是( )。A.无痛性血尿 B.精液中有血 C.尿中有
葡萄胎术后要求随访的时间是A.1年 B.2年 C.3年 D.4年 E.5
吊钩检查项目有:()。(A)无裂纹或显著变形(B)无严重腐蚀、磨损现象(
假设目前收益率曲线是向上倾斜的,如果预期收益率曲线变得较为平坦,则下列四种策略中
商业银行内部评级体系的验证应评估内部评级和风险参数量化的()。A.准确性 B.
投资项目决策分析与评价的基本要求包括贯彻落实科学发展观、资料数据准确可靠和()
某公司商场的机电安装工程,由业主通过公开招标方式确定具有机电安装工程总承包一级资
最新回复
(
0
)