Mr. Jones: What materials were used for road surfaces during the last century?
Engineer: Usually they were gravel and macadam. Tars and asphalt were originally used only as coverings, but later they were used as binders and finally as hot mixtures.
Mr. Jones: Concrete is a modern material as far as road - building goes, isn’t it?
Engineer: Relatively speaking. But you might be surprised to know that a concrete road was built as early as 1893 in Ohio. But it was only 5 miles long. More extensive projects were not undertaken until much later, around 1912 or 1913.
Mr. Jones: This was because of the increase in traffic?
Engineer: That’s right. Especially in the use of heavy tracks. More rigid pavements, such as concrete and brick, became a necessity. For light traffic, though, water-bound macadam, gravel, sand clay, and bituminous mixtures were still used.
Mr. Jones: What are turnpikes usually made of?
Engineer: Turnpikes are usually made of reinforced concrete about 8 to 10 inches thick, placed on a granular sub-base, which in turn is placed on a well - tacked earth subgrade. Of course, the construction depends a lot on the local climate, rainfall, soils, and so on.
Mr. Jones: How do you mean--climate?
Engineer: Frost is one of the main problems. For example, in Maine, where frost is quite frequent, the typical turnpike construction is a thin top layer of asphaltic concrete on a base layer of sand and gravel placed on a 36 - inch, frost - free, granular sub - grade.
Mr. Jones: What is the width of these roads?
Engineer: The early two - lane roads were about 20 feet wide. But with higher automobile speeds, the width requirements increased greatly. To give you an example, the Pennsylvania Turnpike has two 12 - foot lanes in each direction, separated by a median 10 feet wide. On each side there is a 10 - foot stabilized shoulder, marking a total width of 78 feet. The New Jersey Turnpike averages 100 feet in width, with three lanes in each direction.
Mr. Jones: I guess wider roads are being built every day.
Engrneer: That’s right. Sometimes you think that, no matter how good a road you build, the speed and weight of vehicles will always be one step ahead.
选项
A、Sand clay.
B、Macadam.
C、Brick.
D、Bituminous mixture.
答案
C
解析
The engineer指出:For light traffic,water- bound macadam,gravel,sand clay,and bituminous mixtures are used.“bituminous”为“like or containing any of various flammable mixtures of hydrocarbons and other substances that are constituents of asphalt and tar.”含有沥青的。
转载请注明原文地址:http://tihaiku.com/zcyy/3870608.html
相关试题推荐
ThefirstChinesetoreachtheUnitedStatescameduringtheCaliforniaGold
WhichofthefollowingisNOTtrueaccordingtothenews?[originaltext]OnF
[originaltext]LiHua:Pardonme.I’mtryingtofindarticlesonecology.Canyo
[originaltext]LiHua:Pardonme.I’mtryingtofindarticlesonecology.Canyo
[originaltext]LiHua:Pardonme.I’mtryingtofindarticlesonecology.Canyo
[originaltext]LiHua:Pardonme.I’mtryingtofindarticlesonecology.Canyo
[originaltext]WorldTradeOrganizationchiefSupachaiPanitchpakdisaysall
WhydidMr.Greenhaveaterriblefuelbilllastwinter?[br][originaltext]Mr.
WhydidMr.Greenhaveaterriblefuelbilllastwinter?[br][originaltext]Mr.
WhydidMr.Greenhaveaterriblefuelbilllastwinter?[br][originaltext]Mr.
随机试题
BufordisthesmallesttownintheUS.Thetownishighinthemountainsand
Cooperativecompetition.Competitivecooperation.Confused?Airlineallianc
Hetriedto______totheviewofthepublicmoredistinctlythaniscommonlydo
D
填石路堤施工工艺流程中,路基成型的紧后工序是()。A.竣工验收 B.路基
已获利息倍数也称()倍数。A.税前利息 B.利息保障 C.利息费用 D.
根据《建设工程安全生产管理条例》的规定,设计单位的安全责任包括( )。 A、
治疗各种麻风病的首选药A.异烟肼 B.氨苯砜 C.链霉素 D.对氨基水杨酸
某工程项目双代号时标网络计划如图5-49所示,该计划执行到第4周下班时刻检查时,
根据《标准施工招标文件》(2007年版),合同进度计划是指经()批准的施工进度计
最新回复
(
0
)