首页
登录
职称英语
All _______ is a continuous supple of raw materials.A、what is neededB、thing nee
All _______ is a continuous supple of raw materials.A、what is neededB、thing nee
游客
2024-11-02
23
管理
问题
All _______ is a continuous supple of raw materials.
选项
A、what is needed
B、thing needed
C、that is needed
D、is needed
答案
C
解析
此题考查定语从句的用法。当all为先行词时,其定语从句常由关系代词that来引导,如that在定语从句中做宾语,常可省略。因此可以排除B项和D项,C项符合题意。A项错在先行词的重叠,因为what本身兼具先行词和关系代词的作用,如果去掉all就对了。
转载请注明原文地址:http://tihaiku.com/zcyy/3828238.html
相关试题推荐
All_______isacontinuoussuppleofrawmaterials.A、whatisneededB、thingnee
All_______ispeaceandprogress.A、whatisneededB、forourneedsC、thethingn
All______ishisbraveryandperseverance.A、whatisneededB、thatisneededC、the
随机试题
[originaltext](26)Oneofthereasonsforoursuccessasaspeciesisour
Theyhavestudiedfor______years.[originaltext]ManyChinesestudentshave
AsafellowatCambridge,StephenHawkingcalculatedthattheBigBang,whic
酸雨主要是由化石燃料废气中的硫氧化合物引起的。()
2009年1一3月,全国完成房地产开发投资4880亿元,同比增长4.1%。其中,
A.防己 B.川贝母 C.川木香 D.远志 E.木香质坚体重,断面可见棕
沥青混合料的()应满足生产配合比要求 A.矿料级配 B.沥青用量 C.
以下关于市场流动性风险和融资流动性风险的说法中,有误的是()。A.市场流动性风险
在建设工程施工阶段,监理工程师对施工进度计划审核的内容包括( )。A.进度安排是
计算机控制集群液压千斤顶整体吊装的方法适用于()。A.大型屋盖、网架吊装 B.
最新回复
(
0
)